Laserfiche WebLink
COMPVANCE ' " <br />REOUIRED � <br />INSPECTION IMPORTANT: Supply Intormetlon in ihe shaded erea by checklnp the epproprlete clrcles. <br />APPROVED Dlsrepard toplcs that don't descrlta your bullding �r equtpmant. �DI P�ece checka In <br />the two left columns. <br />CJ ❑ <br />❑ ❑ <br />0 � <br />❑ ❑ <br />71L <br />FOUNDATlON PNASE <br />WSEC Foundatlon phase requirements: <br />Inspected by: <br />I FRAMING PHASE <br />- r <br />❑ s All slructurel panels such as plywood, oriemed strand board, paAicie board, and waler board shall be <br />labled 'EXPOSURE I', "EXTERIOR', or "HUD•APPROVED". (VIA�, S. 401.1) <br />❑� Insuletton baNles shail be placed tn atticslceilfngs to maintain at least 1' ventiiatbn space and exlend at <br />least 6" veAically above batls or 12" vertically a6ova bosefili insulatlon (S. 502.1.4.5). <br />� <br />Symbotsused: =.q��i• <br />Page 2 of 6 <br />s pn�fn th�n � Uu Ih�n t pm1�r N�n a pu4 t lu� tN�n or pwl <br />UPD�lED bEPfEM8E1110it <br />