Laserfiche WebLink
everett <br />e <br />INSPECTION REPORT <br />Address ��_�/�-C���� �.//�C, � �� <br />Contractor ��� <br />Owner ---L����!! L�i.v� lirQl'12 5 <br />Date � � �� O <br />IYPE OF INSPECTION REQUESTED <br />❑ bLDG: Pmt. No. �MFCH: Pmt. No. <br />/� <br />i! ELEC: Pmt Na. t� PLBG: Pmt. No. <br />G Temp. Elect. ❑ Framin� ❑ Gas Piuing <br />❑ Footing ❑ Drywall, Nailing ❑ Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ Struct. Slab <br />�jNood Stove ❑ Rough•In -7f�Euial <br />❑ Masonry ❑ Service ❑ <br />❑ APPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION �CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE�MA E 5efore work can be approved. <br />❑ Please contact inspeclor and arrange for appointment. <br />❑ Was not able to perform inspection. <br />CALL 259•8E10 FOR REINSPECTION — 24 hour notice required. <br />A ERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE, PREMI�SES PRIOR TO OC�CUPANCY. \ <br />3 <br />InspeC�or <br />Dale � /� ��7 <br />