Laserfiche WebLink
5. Low Voltage/Communication and Fiber Optics reroute to Library addition. <br /> 6. Provide required documents for SEPA review and make application. <br /> 7. Electrical design for temporary facility lighting and power. <br /> Part 8-Additional Services(not included in contract): <br /> 1. Preparing materials for and attending public presentations,meetings or hearings unless specifically defined <br /> in the Basic Services. <br /> 2. Revising drawings previously approved by Owner,Tenents,or Government Authorities. <br /> 3. Preparing documents for Change Directives,Change Order Proposals,or Change Orders and Drawings for <br /> changes not under the control of the Architect or Architect's consultants. <br /> 4. Value Engineering participation and implimentation. <br /> 5. Code Analysis or Life Cycle Cost Analysis if required by the Owner or Governmental Approvals. <br /> 6. Post Construction Services after Substantial Completion of the project and"follow up"services related to <br /> the construction and operation of the building systems after the final completion. <br /> 7. Preparation of detailed"AS Built"record drawings. <br /> 8. Professional Construction Cost Estimating. <br /> Page 14 <br /> (Form Approved by City Attorney's Office November 1,2009) <br /> 15 <br />