Laserfiche WebLink
CAMPUANCE <br />REOUIflED � <br />INSPECTION <br />APPROVED <br />I❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />■I <br />0 <br />�� <br />IMPORTANT: Supply In(ormetlon In the ahaded area by chedclnp ihe epproprlate circlea. <br />Dlsropard toplcs thet don't descrlta your bulldlnp �r equlpment. ��LQI plece checka In <br />the two left columns. <br />❑ 2 Redlant Slak <br />❑ s Betowprade <br />Q4. E�Yerk <br />OR ` <br />C8, intoi,';, <br />❑ +[� 7herrnal b�e; <br />betweenihe <br />iwdRi frpm thu ;�p Slat <br />�lab Toi;a total dislah�e <br />02.1:-0.9J shall f�s'R•10 <br />p sO Ratlon Requll'Emel <br />Q A: Net toundatic <br />� B: Foundatlon v <br />Q C: Crawl space <br />PHASEj:, <br />5E) <br />e sial <br />I(onec <br />::(�dweliingiconnectedspace ,Qsia,t <br />I(VIAQ, S. 502.1) shfl11 bB met I( ptl@ of thC: <br />ve�tilation afea'is iess than 7 F72 pet 3001 <br />its are closablo: <br />is as a suppiy, or �etum ai�plenum. <br />WSEC Foundatfon phase requirements: <br />nspected by: _ Date <br />�R,�11I�1hIG PH;qS� .� : ` � <br />S". <br />d fouritlalionwall. <br />IS Che.^.kCtl: , - ' ; <br />N� 6p8C9 <br />❑ e All structurat panels such as plywood, oriemed strand board, particle board, and water board shall be <br />Iabied "EXPOSURE I", "EXTERIOR", or "HUD•APPROVED". (VIAQ, S. 401.1) <br />❑� Insulation baffles shall be placed in attics/ceilings to maintain at least 1" ventilation space and e�Aend at <br />least 6" vertically above baris or 12" vertically above loosefill insulation (S. 502.1.4.5). <br />❑ QGlazing efllciency required under the eeleaed optbn shall be {S. 502.1.5, 602.7.2, Table 6-2): <br />�s U,70 (Option p t 1J.65 (Options II, IV) �$ U.75 (Opti�n tif } <br />Us U.60 (�ption Vj � s U.5o (Optinn VI) U j U:45 {OpHon vli� <br />Syrt1b01S U50d: = equele > greeler fhan � leea than i greafer then orequ�l s lees then orequ�l <br />UPDATEDSEPTEMBER1991 <br />Pagc 2 oi 6 <br />