Laserfiche WebLink
Pu��ic woRKs <br />PERMIT <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Streel <br />Evcretl, tYA 98207 <br />(425) 257-8810 <br />)WNERNAMESteVt' Saunders <br />1NDAD�FiES5:71S Wetmore Ave <br />EVERETT WA 982G1 <br />PHONE: <br />TA%PARCEL�.D.M <br />DESCRIPTIONOF Remove 2 <br />PROPOSED WOfiK: C O CiC t2 t 2 <br />PW <br />PERMIT CONDITIONS <br />PHONE: <br />oa« ��za/zooi <br />/ <br />PublicWorksPermitx pWll1U7—ll'.'.E <br />Building Pcrmit N <br />Planning Relerence N <br />PublicWorksFee3 52�5.00 <br />GuaraNee S <br />Lanny Saunders <br />2802 116th Dr SE <br />EVERETT WA 98205 <br />(425)334-3932 <br />ng asphalt Driveway and replace with <br />t. All calls for inspection shall be made 24 hours in a�vance - phone (425) 257-8810 <br />2. All work shall be perlormed in accordance �:�ilh Ihis permit and current City of Everetl Design and Construction <br />Standards and Specifications. <br />3. Call Lxalion Underground Service 48 hrs. belore you dig. TOLL FREE NUMBER 1-800-424-5555 <br />4. Remove and replace existing Driveway - no expansion of existing <br />widths allowed. <br />5. Keep city street clean at all Limes during construction. <br />6. Install expansi.on joint at back edge of sidewal.k. <br />7. Curb, Gutter and/or sidewal.k broken by the cont;actor shall be <br />repaired / replaced at the di=ection of the public works inspector <br />, _ 1i:?i _.. <br />.,`- <br />c,;i�.� _ ... <br />��n�A� :s.� <br />W` <br />r <br />V/ <br />W <br />� <br />� <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the Ciry o� Everetl from any and all claims for <br />damages, costs, expensos, or causes of action that may arise <br />becausu ol installation and maintenance ol the improvemenl or <br />other right•of•way use hereto applied lor and fuMer egrees to <br />remove same upon notice Irom the City antl to replace public <br />prop�rry damaged ereby. <br />SignaWreol licant Dale <br />WORK AUTHORRE� BY 7HI5 PERMIT MUST BE STARTED WITHIN 180 DAYS OF OATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br />TO COMPlET10N. THIS PERMIT MAY BE CANCELLEO BY THE CI7V UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />