Laserfiche WebLink
' 3 <br />CLOSBD CM WOR1C ORDERS R&PORT <br />Total Utility Maintenance Management System <br />12/31/1997 Page 1 <br />Date Range �O1/09/1989 - 12/23/1997 <br />CM Work Order Range :0810800810000 - UT2830-30-322Pattern :7101196751305 <br />Item Range :<Blank> - WVI+3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />_______________________________________________________ <br />__'_____________________ <br />CM WORK ORDER ID: 7101196751305 Title CONVERT 812 WETMORE A�/E <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS1B95A067 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 12/12/1997 <br />Overall Craft: <br />isaued: 12/O1/1997 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft <br />EO <br />WST <br />LJI, <br />ID Name <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />CCL CRAIG, CHESTER L. <br />TDE1 THOMPSON, DWAYNE E. <br />WTE WESTVANG, TERRY E. <br />Materials: <br />ID <br />ADAP34000347 <br />ADAP34000547 <br />ADAP34000647 <br />BOX000056247 <br />COUP34003947 <br />COUP34004347 <br />METE36089447 <br />PIPE34060647 <br />SETT34149747 <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />Description <br />ADAPTER 3/4" CST X INSTA-TITE@ <br />ADAPTER 3/4" MIP X INSTA-TITEQ <br />ADAPTER 3/4" FIP X INSTA-TITEQ <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" 1/4 BEND COPPER@ <br />COUPLING 3/4" MIP X COP ELL 0 <br />METEi� 5/8" X 3/4" NEPTUNE T-10 <br />PIPE 3/4" POLY I.P.S. <br />SETTER COP 5/8" X 3/4" (H7") <br />Actual Hrs <br />4.00 <br />8.00 <br />4.00 <br />Total Labor Cost <br />Date <br />12/10/1997 <br />12/10/1997 <br />12/10/1997 <br />12/10/1997 <br />12/10/199� <br />12/10/1997 <br />12/10/1997 <br />12/10/1997 <br />12/10/1997 <br /># Used <br />----- 1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />6 <br />1 <br />Cost <br />-----78.88 <br />153.20 <br />63.12 <br />----295.20 <br />Cost <br />------8.16 <br />16.86 <br />7.71 <br />12.94 <br />7.53 <br />3.81 <br />30.67 <br />1.14 <br />38.65 <br />Total Material Cost: 127.47 <br />Vehicles: <br />ID Description Hours <br />------------ ------------------------------ --- <br />VJ0026 '97 FORD 1 TON SVC TRUCK 8.00 <br />Cost <br />---- 47.20 <br />Total Vehicle Cost: 47.20 <br />Work Description: <br />-------------------------------------------------------------------------------- <br />METER #41908479 <br />