Laserfiche WebLink
CLOSED CM WORR ORDERS REPORT <br />Total Utility Maintenance Management System <br />08/29/1997 Page 2 <br />_�________��_�____________________________________________________________�_____ <br />Date Range :12/03/1900 - OS/12/1997 <br />CM Work Order Range :1001091070001 - UT0021-35- Pattern :7101236740311 <br />Item Range :<Slank> - WVL3694L05 Pattern :* <br />Proqram ALL Function ALL Activity ALL <br />___=====a--------------------------= ------------------------------------------- <br />---------- - -------------------------------------------- <br />CM WORK ORDER ID: 7101236740311 (continued) <br />PIPE46304347 PIPE 8" PVC SEWER <br />PIPE46304347 PIPE 8" PVC SEWER <br />PIPE46304347 PIPE 8" PVC SEWER <br />PIPE46304347 PIPE 8" PVC SEWER <br />PLUG42304747 PLUG 4" DUO SEAL "SEWER" <br />vehiclas: <br />ID <br />---------- <br />V0010 <br />V2112 <br />V2113 <br />V2225 <br />V2230 <br />V2231 <br />V2663 <br />V3200 <br />V3507 <br />V6401 <br />VH0002 <br />VJ0004 <br />VJ0017 <br />VJ0019 <br />Description <br />--------------------------- <br />'92 GMC S10 PU <br />91 CHEV 1 TON <br />91 CHEV 1-TON <br />88 FORD BYD <br />91 FORD F800 DUMP 5 YARD <br />90 FORD DUMP 5-YARD <br />87 VACTOR <br />80 CASE VIBROMAX W25 ROLLER <br />88 CnSE BACKHOE 4X4 <br />80 CASE FLATBED TRAILER <br />1993 VACTOR <br />'95 CHEV 1-TON <br />'96 FORD 5 YARD <br />'96 FORD 1 TON <br />07/08/19�7 91• 193.83 <br />07/10/19y7 26 55.38 <br />07/22/1997 91 193.83 <br />07/23/1997 54 115.02 <br />07/10/1997 2 7.50 <br />Total Material Cost: <br />Hours <br />14.00 <br />4.00 <br />4.00 <br />4.00 <br />56.00 <br />32.00 <br />7.50 <br />4.00 <br />64.00 <br />4.00 <br />4.00 <br />32.00 <br />4.00 <br />2.50 <br />Total Vehicle Cost: <br />Cost <br />75.60 <br />21.24 <br />21.20 <br />61.44 <br />604.80 <br />332.80 <br />357.75 <br />78.88 <br />2361.60 <br />0.00 <br />207.60 <br />188.80 <br />59.00 <br />14.75 <br />4385.45 <br />Work Description: <br />--------------------------------------------------------------- <br />INSTALLED 8" PVC DRAIN LINE DOWN ALLEY - 4 CB'S. <br />Total cost for work order 7101236740311: <br />10310.48 <br />' 4i� <br />