Laserfiche WebLink
everett INSPECTION REPORT <br />eAddress �n�n/Ci L.c/I l�O � S I�� <br />G C <br />Contractor V�I�,,,v L, <br />Owner _ ����t��ni <br />Date 8-17-B9 <br />TYPE OFINSPECTION REQUESTED <br />� BLDG: Pml. No. Zz 38�0 ��1 MECH: Pmt. No. _ <br />❑ ELEC: PmL No. �/ i�� PL�G: PmL No. <br />❑ Temp. Elect. [y Framing ❑ Gas Piping <br />❑ Fooling �5`orywall, Nailing ❑ Consuflation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid ❑ Struct. Slab <br />❑ \Nood Stove C Rough-In �Final <br />❑ Masonry ❑ Service ❑ <br />❑ APPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION F�CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please coMact inspedor and arrange (or appointment. <br />❑ Was not able to perform inspection. <br />C�ALL 259-8870 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector <br />� <br />