Laserfiche WebLink
everett <br />e <br />INSPECTION REPORT <br />Address ��Q ���cJ �J <br />Contractor _ 1}G�-� ¢����/���j�s+ <br />Owner �� 7 <br />Date '-/�l^� � <br />TY�E OF INSPECTION REQUESTED <br />!� BLDG: Pmt. No. '"' MECN: Pmt. No. <br />i�C: Pmt. No. �G�� '.�' PLBG: Pmt. No. <br />❑ Temp. Elect. ❑ Framing ❑ Gas Piping <br />❑ Footing ❑ Drywall, Nailing ❑ Consultation <br />❑ Foundation G Shenr Nailing ❑ Groundwork <br />❑ Duciwork ❑ Grid O Siryct. Slab <br />❑ Wood Stove ❑ Rough-In QrPtnal <br />❑ Masonr� O Service ❑ <br />C/7•kPPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections listed below 1.1UST BE IdADE before work can be approved. <br />❑ Please contacl inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 259-8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector__��'J�%� _p.ate"! / �"�-" <br />