Laserfiche WebLink
}ici-. .,�' ,�1� HUD-FHA SEATTLE AREA OFFICE <br />ADDENDUM � FHA COMMITMENT FHA CASE N0. 561- 257071-��i <br />SI�ET 1 OP 1 ADDRESS 521 - Winton <br />j�p� Aug. 17, 1972 Gverett, NasltinKCon <br />Soecific commitment conditions (applicable when checked) <br />Note: A11 required repairs must be completed in a professional manner. <br />Al1 certifications and/or pest control certificate oP completion must be .;ubmittel <br />obtained and an,y repair work commenced. <br />VC11 � This commitment is issued on the condition that if the mortgage is to be insured under <br />Section 235(i) or (j)� the seller will execute an agreement, in the form prescribed by <br />the Secretary, to reimburse HUD for expenses i.ncurred in repairing defects found eli- <br />�ible for repais under Section 518(b). Also, a seller who is not the last permanent <br />occupanc of the property and who is not subst�.ntial�y rehabilit¢ting t;he property under <br />Section 235 rm:st deposit 5 Percent af the sales price in escrow with the mortgagee in <br />accordance with terms of the seller's agreement. <br />VC12 /�% Submit certification i1�om the loral authority having jurisdiction that the subject <br />�r" property is in compliance with the Local Mini.mum Housing Code. <br />VC13 �`% Submit certification i�om a state licensed pest control operator that wood destroying <br />Tr organisms, flmgus and�or rot damege in all of the dwelling, interior and exterior, have <br />been eliminated. A"Standard Notice of Work Completed" or a report form indicatinp, no <br />infestntion mtsy be submitted as certification. Note: AL1 repairs must be completed <br />in conformnnce with local professional building standards and local building codes. <br />VC14 Q Submit a certification on approved form from a licensed Q plumbing Q heatin� <br />Q electrical contractor certifying that the appropriate system(s) is in good <br />operable condition, is propex•ly installed� and is consistent with code enforcement <br />scandards applicable to this jurisdiction. <br />VC15 ,�,% �'nish evidence from the local health authority indic¢ting approval of the <br />Q individual wuter supply system� Q individual cewap,e clispostsl system. <br />VCi6 � Submit certification from the state electrical inspector thai; service panel and <br />electrical distribution system conforms with present State Electrical Code. <br />VC17 Q�(a) Q re-roof [� repair raof of Q dwelling nnd�ar' Q gerage with minimum <br />235# self seuling composition shingles or #1 cedar shingles, and repais sheathing and <br />install new flashings as necessary. Remove all old roofing when two or more layers <br />exist. Composition or cedar shingles net acceptable over a"built-up" roof. Contractor <br />to certil'y that requised work is complete and roof is in good condition. <br />�(b) Submit certification Srom roofing contractor that roof is in Qood condition <br />und not in need of repair or replacement. <br />VC18 Q Paint al1 exterior metel and wood trim of �] house and�or �] gerage after adequetely <br />preparir� surface. <br />VC19 � paint entire exterior of Q house and�or Q garage including trim. Prepnre curface <br />by renniri.n� dama�ed areas, remove all loose paint and blisters and apply an undercoat <br />to all bare wood. <br />� VC?0 [] Itcmove the existin� floor covering in the following rooms: <br />Replace witll new resilient floor coverin� over suitnble underlayment after makirtg <br />necessary repairs to snbfloor. Carpeting not acceptable in kitchen and bath erens. <br />VC21 Q Repair, paint and caullc a11 window sash and doors to operative condition. blinimwn of <br />one window shall open in each raom. <br />VC22 Q Install a 3��+�� non-adjuataUle temperaturc and pressure relief valve on hot water tank; <br />and a 3�4" cli.scha.r�e line to outside or to an interior drain, Rating of valve shall <br />not be greater than pressure ratin� of water tank. <br />VC23 Q Q�a) Replace all deteriorated rotted or damaged wood foundation and framin� members, <br />includir�, posts, plates, beams and joists in underfloor area� with sound material. <br />h'o wood to remain within 6" of ground. <br />Q(b) Replace aLl skirting and o.her wood in contact �aith the �round and replace <br />with material resistant to rot and infestetion. Finish all exposed new or repaired <br />work to match exterior. No wood to remain w'.thin 6" of ground. <br />VC24 � U(a) Install new gutters under all eaves on main buildin�. Provicie ade�unte drn,m- <br />spouts and splash blocks. Apply primer and two coats of exterior paint to motcli <br />existing finish. <br />U(b) Install elUows for downspouts and provide snlasli Ulock.; Co ..arry roui �aater at <br />leust ttu•ee feet away from found�tion. <br />