Laserfiche WebLink
Ltr. C0804-011 <br />May 19, 2008 <br />Page 2 <br />9. Show roof pitch on details and clevations. <br />10. Show footing dimensions and stem wall. Show reinforcing steel. Specify anchor bolt <br />size and spacing. Provide 3" x 3" x�/a" plate washer on all anchor bolts in braced wall <br />lines. <br />I 1.1'ypical section does not show insulation around perimeter of the foundation. Show <br />requireci insulation. <br />12. Various sections call out both R-19 and R-21. Plcase clarify <br />13. Providc insulation baffle per Section 502.1.4.5 of the Washington State Encrgy Cale <br />�wsr:c>. <br />14. The typical section show a slab-on-grade but the tloor plan shows 2 x 8 joists. <br />I5. Provide separate foundation plan. (Ploor framing can be shown on foundation plan). <br />Please pre�pare a response letter showing wl�ere eacl� item in this correction <br />letter is addressed on tl�e plan set. <br />Upon resubmittal of the drawings, your application will be given priority and plan review will <br />recommence. <br />All required suUmittals shall bc of sufficient detail and contain sufficient inforniation to ensure <br />tliat lhe proposed structure will be conslructed i�t compliance wiQ� all adopted codes. <br />Sinccrcly, <br />����v�_ <br />��rr ►��;i�„�„ <br />Dc��clopmcnt 7'echnician <br />�2 <br />UI:DVPI.NfK�ItiTN/IIbJ1.41 WCU4N 111I iA�U %A\'IIiR N',11'1 <br />