My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8413 XAVIER WAY 2016-01-01 MF Import
>
Address Records
>
XAVIER WAY
>
8413
>
8413 XAVIER WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 11:15:13 AM
Creation date
3/9/2017 3:47:20 PM
Metadata
Fields
Template:
Address Document
Street Name
XAVIER WAY
Street Number
8413
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
InsoectionTvpe Datc Result Remarks <br />Permit: C0804-011 Status: Issued: 1I2/09 Finaled: To Records: <br />Descriplion: REMODEL (WORK BEGUN W/O PERMITS) <br />Notes/Condilions: 'VfRifY50UTN7NTfRIORSfTB.1CK-SNOWSCLOSEPON705/605YNL <br />'32X36 ADDI770NSTAR7t� WI7HOUTPfRMITS-CONVfRTCARPORi <br />IN70 6ARA6E <br />Other 1123/09 Violation <br />NO INSPECTIONS TO BE DONE UNTIL CHECK HAS CLEARED. <br />This check was written on January 2 and was returned today NSF. The names on the check are <br />DREAM 2 DESIGN and NICOLE M. STREMLOW-MONAHAN. The check was written for $1,579.68 <br />wilh the memo "BEKINS". Let me know if you have any other info on what this check was paying. <br />I will send out a Demand (or Payment letter tomorrow. <br />Site Visit 1123109 Other See Notes <br />STATUS CHECK - OBSERVED NO NEW CONSTRUCTION ACTIVITY AT THIS VISIT. <br />IF THERE IS NO RESPONSE TO NSF CHECK, MAY NEED TO BE TURNED OVER TO CODE <br />ENFORCEMENT BECAUSE OF POSSIBLF ENCROACHMENT. <br />Other 5/22/09 Approvat See notes - check cleared <br />A cashier's check was delivered lo lhe collection agency on 5-22-09. This permit is cleared for <br />construction. <br />Foundation 6/30I09 Corr Reqd Consultation-see notes <br />Corrections: <br />1. Contact Structural Engineer about Footing reinforcement requirements <br />2. Provide revision from Engineer <br />Consullation 9l2/09 Re: Plumbing to be to UPC <br />Framing 9I2/09 Consult-see notes <br />Consultation for correction Floor joisl cuts for Plumbing cutouts- 2 x6 floor joist 16" oc- recomend <br />ArchitecUEngineer design for supports <br />PlbgRoughln 9I4/09 Approval As per notes <br />Rough in waslelvents ok as noted: <br />1. Add 23" cleanoul to crawl and relief line for holwater tank <br />Inspector will look at next inspeclion for water line roughin <br />Foundation 9/2/09 PartialApproval See 09/02/09 Footing noles <br />Footing 912I09 PartialApproval See notes <br />1. Footing Reinforcemenls at Soulh and East Walls <br />2. Add washers and nuts into new footings al anchor bolts as discussed <br />3. Call tor Reinspection of next phase of fooling reinforcemenls <br />PlbgRoughln 9I28I09 Approval As per noles <br />Rough in Plumbing ok as noted: <br />1. Relief line will be inspected at Final <br />Footing <br />Foundation <br />Framing <br />Note: <br />1. Eleclrical Sign off <br />2. Mechanical Sign off <br />9I29I09 Approvai <br />10/16/09 Approval <br />11120/09 PartialApproval <br />Do not insulate until #t is complete (etc) <br />Final Mech 11123/09 Approval <br />S:\MMcleodlCrystalllnspections18413 Xavier.rpt <br />Balance of footings <br />Perimeter Insulation <br />See notes <br />As per notes <br />213/2011 age 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.