My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8612 XAVIER WAY 2016-01-01 MF Import
>
Address Records
>
XAVIER WAY
>
8612
>
8612 XAVIER WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 11:02:39 AM
Creation date
3/9/2017 3:51:02 PM
Metadata
Fields
Template:
Address Document
Street Name
XAVIER WAY
Street Number
8612
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cr.ossu cx woxx oxu�s �arotrr <br />Total Utility Maintenance Management System <br />10/25/1996 Paqe 1 <br />Date Ranqe o01/09/1989 - ln/25/1996__________________________________—_________ <br />CM Work Order Ranqe :1001091070001 - UT2600-02- Pattern :7103096750224 <br />Item Ranqe :<Slank> - WW22020001 Pattern :* <br />Proqram ALL Function ALL Activity ALL <br />_—`-----____== =-�________________�=_=____�_ <br />C![ WORK ORDER ID: 7101096750224 Title: REPAIR 8612 - XA,VIER WAy �A � <br />«DUPLIC�,TE PRINTING OF THIS WORK ORDER» <br />Item ID: SS1885C065 -- SEWER SERVICE <br />Location ID: -- <br />Proqram 710 Function 109 Activity 675 <br />Date Complete�: 10/25/1996 <br />Overall Craft,: <br />IssIIed: 06/28�1996 <br />Out of Servic�? No <br />Meter Readinq:: <br />Downtime: 0 hours <br />status: HN <br />Labor: <br />Craft ID <br />----- ------ <br />HSO �, <br />3UP1 AGA <br />EO SR <br />Materials: <br />ID <br />BRIC00061156 <br />CEME00061438 <br />COUP44300147 <br />fiLIA44303447 <br />n�Ricles: <br />ID <br />------------ <br />V2006 <br />V2230 <br />V3507 <br />Name <br />Issued by: HDA assiqned to: <br />Priority: Travel Time: 0,00 Hr. <br />ARNOLD, ARTHUR L <br />l,HLES, GREGORY A. <br />SIERR.�, R]�►ON (N!!I) <br />Description <br />BRICK CONCRETE 2" X 4^ X 8" <br />CEMENT 20 MIN. SET 50 LB. SaG <br />COUPLING 6" CONC X 6° Cl/PL <br />ELL 6" 45 DEG SP X GASKETED <br />Description <br />87 TOYOT.�, PU <br />91 FORD F800 DUMP 5 <br />88 CASE BACKHOE 4X4 <br />Planned Hrs Actual Hrs <br />0 00 4.00 <br />0.00 1.00 <br />0.00 4.00 <br />Total Labor Cost: <br />Date ,� Used <br />----- -------- <br />06/28/1996 4 <br />06/28/1996 1 <br />06/28/1996 1 <br />06/28/1996 1 <br />Total Material Cost: <br />Hours Cost <br />1.00 5.10 <br />Y�� 4.00 45.60 <br />4.00 171.20 <br />Tot�l Vehicle Cost: 221.90 <br />Cost <br />76.48 <br />21.34 <br />93.52 <br />171 34 <br />Cost <br />1.60 <br />11.31 <br />6.67 <br />4.75 <br />24.33 <br />Total cost for work order 7101096750224: 417 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.