Laserfiche WebLink
. = � C <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard q601. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per Ciry of Everett <br /> Storm Manual 3-2.6.2. �/Vidth_, Depth_, Length_, <br /> 10 The contractor must meet with the Pi�blic Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11. Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosiun control measures per City of Everett Standards for small parceis <br /> C�\Remove erosion control measures upon completion of the project prior to final approvai of the <br /> permit. <br /> 14.�q11 excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Ple.n #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector(i.e. ali unused <br /> driveways and any broken or damaged area must be replaced), <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the � ( i f� Water District for connectin <br /> water and sewer services. 9 Provisions for this building's <br /> 19. A catch basin as per Ciry Standard P!an #402 with a gas trap per Standard Plan #410 is <br /> required for the parking erea. <br /> 20. If a sewer pump system is to be instailed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> PWCommeNs <br /> �!7C � � �-�1�0� ���c�- , ��i <br />