Laserfiche WebLink
Geotectuiicel Engineering Letter <br /> 3505 S6ore Avenue Deck Addition <br /> Everott,Washington <br /> May 2ti,2010 <br /> NGA File No.8271 l0 <br /> Page 7 <br /> Erosion Control and Slope ProtecUon Meuures <br /> The erosion hazefd for the on-site soils is coosideczd high,but the actual hazud will be dependent on how <br /> the sitc is gaded and how watcr is allowed to concentrate. Best Management Practices(BMPs)should be <br /> used to control erosion. Areas dismrbed during conshuction should be protxted Crom erosion. Erosion <br /> contrnl measurcs may include diverting surface w:der away from the stripped or disturbed arws. Silt <br /> fences or straw balcs should be erecud to prcvent muddy water from leaving the site. Stockpila should <br /> be covered with plas6c sheeting during wet weather. Dist�ubed accas s6ould be planled as soon as ' <br /> practical end the vegetetion should be maintained until it is atablished. The erosion potential of areas not <br /> stripped of vegetation should be low. <br /> Protection of the setback and steep slope arcas should be perfomted es roquired by lhe City of Evcrett. <br /> Spxifically, we cecommcnd that lhe setback etea end top of slope not be disturbed or modified through <br /> plaament of eny fill or removal of t6e ezisting vegetadon. No material of any kind should be placed on <br /> the slope or be allowed to reach the slope,such as excavation spoils,lawn clippiags,and other yard waste, <br /> trash, and soil stockpiles. Ttees should not be cut down or removed from the slope unless a mitigetion <br /> plan is developed, such as the replacement of vegetaGon for erosion protection. Replacement of <br /> vegetation should be performed in accordance with Everett Municipal code. Any proposed development <br /> within lhc sUback area, other than light dxks or patios, should be the subject of a specific geotcehnical <br /> evaluation. Unda no circumstances should wata be allowed to concenhate on the�lopes. <br /> Site Preparatlon and Grading <br /> We do not anticipale large scale grading for this project. Mer erosion control measures are implemented, <br /> site propazation should consist of stripping eny topsoil or loose soils to expose medium dease or better <br /> native soil in foundation and slab-on-grade areas. The sVipped materials s6ould be rcmoved from t6e site <br /> or stockpiled for later use as landscaping fill. On1y vc.y limited amounta of material shwld be stcel�iled <br /> on this site. Stockpiles should be kept away from the tep of the steep slope and setback azsas. Stockpiles <br /> should bc covaed with plastic. <br /> If the ground surface afier stripping should appear to be loosc,it should be compaceed to a non-yielding <br /> condition. Arees observed to pump or weave during compaction should be reworked to suuctural fill <br /> specifications or be over-excavated and replaced with swctuml fill or rock spalls. If si�ificant surface <br /> \ <br /> 1 <br /> NELSON GEOTECHN/CAL ASSOCIATES, INC. � '�(} ; <br />