Laserfiche WebLink
. ( �' <br /> May as, i� <br /> PBge 2 <br /> Ellen Cooper Bob Blair <br /> Risk Manager-Woridwide Operations Construction Director <br /> Group Safeway,Inc <br /> MicrosoR Corporation 1121-124*Ave N.E. <br /> One Microsoh Way Bellewe,WA 98005 <br /> Redmond,WA 98052-6399 42-`*63�"224� <br /> 425-705-2581 <br /> I have provided plan review services for all of the above mvering a wide <br /> variety of systems. As for reviewing the FM system speciRcallY bein8 ProPo� <br /> for DSA, this would be a first. However, the proposed system dces not present <br /> any technology that I am not familiar with. I have reviewed plans for double <br /> interlocked pre-action systems activated by lineal detection. I have a rnpy of <br /> the FM guidelines for the proposed project and n►y review would be in strict <br /> att�ordance with them. <br /> Please feel hee to contact any of the above mmpanies to verify my past <br /> services. If you have any questions,please give me a call at 206-749-48.56. <br /> Best Regazds, <br /> philip J.Lundquist ��� <br /> Senio*Vice President <br /> CC: Rich Wilson-DSA <br /> Ernie Snyder-FSA <br /> Donna Keene-AON <br /> Warde Comeaux-Global Fire Protection <br /> �3 <br />