My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 SHUKSAN WAY 2016-01-01 MF Import
>
Address Records
>
SHUKSAN WAY
>
1001
>
1001 SHUKSAN WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 7:37:09 PM
Creation date
3/9/2017 7:34:52 PM
Metadata
Fields
Template:
Address Document
Street Name
SHUKSAN WAY
Street Number
1001
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
565
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i . � <br /> IThe volumes for the open water cells and weHand treatment all are as follow: <br /> ITwn Open Water Cells <br /> Volume of the dead storage at elevation 513.5 = 0.(� acre-ft <br /> � Volume of the dead storage at elevatio�.�515.0= 0.43 acre-ft <br /> Volume of the dead storage at elevation 517.0= 1.65 acre-ft <br /> IWetlond Treatment Ce!! <br /> � Volume of the dead storage at elevation 513.5 = O.W acre-ft <br /> Volume of the dead storage at elevation 517.5 = 0.32 acre-ft <br /> IPond Control Structure <br /> I The Santa Barbara Urban Hydrograph (SBUH) method was used with the WaterWorks computer <br /> program to calculate the orifice sizing. The calculations are in Appendix A. <br /> I Ori6ce size for elcvation 515.32 feet=2 inch <br /> Ori6ce siu for elevation 521.61 fat =5-3/8 inches <br /> Orifice size for elevation 522.73 feet =7-1/2 inches <br /> 1 <br /> I Emergency Ove�flow Spillway <br /> The /998 King �ounry Sur;'ace Woter Design Manual was used to calculate the dimensions of the <br /> I spillway for the 100-year developed condition runoff. The invert of the spillway was set at 524.50 <br /> feet, 12 inches above the 100-yeaz water surface elevation, so the spillway's riprap blanket would <br /> be above the peak stage elevation. The length of the overflow spillway weir(L) was calculated at <br /> I 75 feet based on a head (h) of 0.2 feet. See Appendix B for calculations. <br /> � <br /> f 6. Analysis and Design of Required Source Control BMPs <br /> ! <br /> The following 5ource Control BMPs wtre identified as appropriate for The FSA warehouse <br /> � basecl on the Construction Activities Checklist (see Table 2) and are described in the Washington <br /> State Depaztment of Ecology Stormwater Management Manual for the Puget;ound Basin. <br /> I . C1.20 Handling of Petroleum Products <br /> . C1.30 Nutrient Application and Control <br /> I • CI.40 Solid Waste Handling and Disposal <br /> • C1.50 Use of Chemicals During Construction <br /> . C1.60 Managing Hazardous Products <br /> IFood Services o(America Stortnwater Sire Plan and Stamwata Darntim Pood ,=,� <br /> I Hydraulic Rcport '� � r <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.