Laserfiche WebLink
I <br /> I <br /> 3. �pen the doors 10 the vault and allow Replacement cartridges will be delivered to <br /> the system to air out for 5-10 minutes. the site. Infcrmation concerning hrw to <br /> obtain the replacement cartridges is <br /> 4. Withou', entering the vaull, inspect lhe available from CONTECH Stormwater <br /> inside �f the unit, including components. Solutions. <br /> ! 5. Take notes about lhe exiernal anc Warning: In the case of a spill, the worker <br /> internal condition of the vault. should abort maintenance activities until <br /> the proper guidance is obtained. Notify the <br /> ! Be sure to record ihe level of sediment local hazard control agency and <br /> build-up on the floor of the vault, in the CONTECH Stormwater Solutions <br /> I f�xebay, and on top of the cartridges. I( immediately. <br /> tlow is occurri�g, note the Ievei oi water <br /> and estimate the ilaN rate per drainage To conduct cariridge replacement and <br /> I pipe. Record all observations. sediment removal maintenance: <br /> 6. Remnve large loose debris and trash 1. If applicable, se�. up safety equipment to <br /> using a p�le wilh a grapple or net on ihe protect pedestrians (rom fall hazards <br /> � end. due to open vault doors or when work is <br /> being done near walkways or roadways. <br /> 7. Close and faslen the door. <br /> � 2. Visually inspect the externai condition ot <br /> 8. Remove safety equipment. the unit and take notes concer^ing <br /> detects/problems. <br /> 9. Make notes aboul the locai drainage <br /> � area relative to ongoing construction, 3. Open the doors to the vault and allow <br /> erosion problems, or hiylr loading of tlie system lo air out for 5-10 minutes. <br /> olher materials lo Ihe system. <br /> I 4. Without entering the vault, give the <br /> 10. Finally, reviaw the condition reports from inside of the unil, including components, <br /> the previous minor and major a general condition inspection. <br /> mainlenance visits, and schedule <br /> cartridge repiacement if needed. 5. Make notes about the extemal and <br /> internal condition of the vault. <br /> Major Maintenance <br /> Give particular attention lo recording tlie <br /> Depending on Ihe con(iguration o( the level o( sediment build-up on the tloor of <br /> particular system, a worker may be required lhe vault, in the forebay, and on top o( <br /> lo enter ihe vault to per(orm some tasks. the intemal components. <br /> Important: If vault entry is required, OSHA 6. Remove large loose debris and trash <br /> rules for confined space entry must be using a pole with a grapple or net on the <br /> (ollowed. end. <br /> Filter cartridge replacement should occur 7. Using a boom, crane, or other device <br /> during dry weatlier. It may be necessary to (dolly and ramp), offload the <br /> plug the filter inlet pipe if base fiows exist. replacement cartridges (up to 150 Ibs. <br /> Standing waler present in the vault should each)and set aside. <br /> be regarded as polluted and should be 8. Remove used cartridges from the vault <br /> contained during this operation by using one of the following methods: <br /> temporarily capping the manifold <br /> connectors. <br /> �L� <br /> i..20Gu COIlTGCH Stonmcater Satuticns Toll-Ireo:800.5481667 5 0�9 <br /> ccmernslznn:.atrzr cnm Vnun,CiP an��mear S�o�nFnler Operabon and Alaintenxnce GuiEahnes <br />