My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1202 SHUKSAN WAY 2018-01-01 MF Import
>
Address Records
>
SHUKSAN WAY
>
1202
>
1202 SHUKSAN WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2019 3:42:29 PM
Creation date
3/9/2017 7:53:05 PM
Metadata
Fields
Template:
Address Document
Street Name
SHUKSAN WAY
Street Number
1202
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
49. The Washington Stata Clean Air Act requites the use of all irnown, available,and <br /> roasonable means of controlling air pollution,including dust. Dust generated during <br /> construcNon activities can be controlled by wetting those dust soiu�ces such as areas of <br /> exposed soils,washing truck wheels before they leave the site, and installing and <br /> maintaining gravel construction entrances. Coc�struction vehicle track-out is also a major <br /> dust souroe. My evidence of track-out can trigger violations and fines from the <br /> Department of Ecology or the Puget Sound Air Polludon Control Agency. <br /> GENERAL INFORMATION <br /> 1. Puget Sound Energy irs the natural gas provider in this azea. To initiate new service <br /> orders, please contact(425)356-7512 at least 90 days prior to the required in-service date. <br /> � Any relocation of existing gas facilities for this development will be at the developer's <br /> sole expense, and requires 90 days minimum notice. Please contact Elaine Babby at <br /> (425)462-3805 to coordinate rolocation requests. <br /> 2. The Snohomisl� County PUD currently has sufficient capacity to serve the proposed <br /> development. However, the existing District facilities in the local azea may require <br /> upgrading. Cost of any work, new or upgrade, to existing facilities that is required to <br /> connect this proposed development to the Disuict electric system shall be in accordance <br /> with appticable District policies. <br /> For further information about specific electrical service requirements,please call the <br /> District's Everett Office at 425-258-8272 to contact a Customer Engineer. <br /> 3. Verizon Northwest has facilities near this location. However, any building entrances <br /> must be coordinated at least 60 days in advance. The cost of any relocation of Verizon <br /> facilities that is required to construct the new apartments will be at the total expense of <br /> the developer. Any rolocation will take 60 to 17.0 days. Please contact Mike Hupf, <br /> Engineer at(425)356-4052 or Mike Bly, Engineer at(425)356-4034 if you have any <br /> questions regarding this building entrance. <br /> 4. The Postal Service requested a Cluster Box Unit(CBU) be installed to service alll <br /> businesses along Shuksan Way. When Food Services of America moved in, and was the <br /> only business, the Yostal Service granted them a Temaorarv mailbox and locatioo, until <br /> one or more additional businesses were built. <br /> The US Postal Service requires that the CBU be installed at a location approved by the <br /> US Postal Service before any future deliveries will be approved. Contact Paul Charlton, <br /> SGrowth Manager, 3102 Hoyt Ave,Everott, WA 98201-9998, phone: 425-258-1430. <br /> �/Zv <br />
The URL can be used to link to this page
Your browser does not support the video tag.