My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1202 SHUKSAN WAY 2018-01-01 MF Import
>
Address Records
>
SHUKSAN WAY
>
1202
>
1202 SHUKSAN WAY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2019 3:42:29 PM
Creation date
3/9/2017 7:53:05 PM
Metadata
Fields
Template:
Address Document
Street Name
SHUKSAN WAY
Street Number
1202
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i � <br /> Ihe diflicuh if not im�ssihle. li is unlil:ch diat tlic �ill soil �rill he sui�ahle for use as struchiral lill <br /> at the site except during cstcnded dq��riods. <br /> I If the on-sitc glacial tiil is not suitable,thcn wc rceommend thal imponed slructur;d fill m:ncri::l <br /> Ihavine no more than ahout 5 perccnt fines be used. If thc material is too wct whcn dcli�cred io Ihc <br /> site. or of it becomes overly wet from rnin, it musl bc aerated and dried out prior to placcmcm as <br /> I fill. During eatended periods of dry wcadur conditions, a structural fill tnaterial ��ith more Ihan <br /> 5 perceni fincs may be usable. <br /> I �1.2.6 Fill Placement <br /> Unless specificd othenvise in this rcpon, the followine cencral requircmcnis shall apply to :dl <br /> � fill and backfill placement. <br /> 1. All fill and backfill tnust be placed in thin lifts so that wiifortn crnnpaction can he achicved <br /> Uvoughout the entirc lift thickness. In general,granular soils with less than 5 percent fines can <br /> ( be placed in lifts of about 12 inches or less loose Ihickness. On-site glacial till soils williin 2 <br /> � percent of the optimum moisture content should be placed in Ioose IiRs not escceding six <br /> r inches. Till soils more than about 2 percent wet of optimum ma� requirc aeration to uchicvc <br /> Iproper compaction. Each lift must be compacted prior to placing the subsequent lift. <br /> 2. All s[ructural fill beloN• Ihe building arca must be compacted to at least 95 percent MDD as <br /> j determined by the ASTM D 1557 test procedure. The uppermost '_4 inches of subgrade soils <br /> � below pavemenls must also be compacted to at Ieast 95 percent MDD per ASTM D 1557. fill <br /> 1 and backfill more than 24 inches below pavement subgrade must be compactcd to at least <br /> 92 percent MDD per ASTM D 1557. <br /> 3. Prior to compaction,the structural fill material should be moisture conditioned to within atwut <br /> I 3 percent of optimum moisture content, othenvise adequate compaction may bc di�cult to <br /> achieve. For 95 percent compaction, it may be necessan•to dry the till soils to within 2 percent <br /> of die optimum moisture content. <br /> � 4. Compaction must be achieved by mechanical mcans. No ietting, ponding or Oooding �eill bc <br /> allowed for compaction. <br /> During fill and backfill placement, a suitable number of in-place density tcsts sliould be <br /> � performed concuRently u ith die filling to check that the required compaction is being achieved. <br /> � 4.2.7 Temporery Cut Slopes <br /> Temporary cut slopes are anticipated for consWc[ion of underground utili[ies and to <br /> I accomplish placement of swctural fill below foundatiuns. All temporary cu[ slopes and shoring <br /> must comply with the pro��isions of Title 296 WAC, Part N, "Excavation, Trenching and Shoring." <br /> Tne contracror pedorming the work must have the primary responsibiliry for protection of workmen <br /> I and adjacent improvements, deciding a�hether or not to use shoring, and for establishing die safe <br /> � inclination for open-cut slopes. <br /> I <br /> l �/ <br /> G c o [ n r i n e c r s ]� FilcNo. 7584-OOb00d130\050101 �� <br /> l `� <br />
The URL can be used to link to this page
Your browser does not support the video tag.