My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
909 SIEVERS-DUECY BLVD RAMA HOUSE 2016-01-01 MF Import
>
Address Records
>
SIEVERS-DUECY BLVD
>
909
>
RAMA HOUSE
>
909 SIEVERS-DUECY BLVD RAMA HOUSE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 8:00:20 PM
Creation date
3/9/2017 8:00:08 PM
Metadata
Fields
Template:
Address Document
Street Name
SIEVERS-DUECY BLVD
Street Number
909
Tenant Name
RAMA HOUSE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBL/C N/O/�/C5 <br /> ]anuary 12, 2011 <br /> ��f�1v��vd llntAE���t�� <br /> TRACE DEVELOPMENT LLC ��`� CoD� <br /> 1605 NW SAMMAMISH WAY #107 SOn� �tSq/w � -Ll -I! I <br /> ISSAQUAH, WA 98027 �J.b ,QGT NH� /�6q! ��hk �l�'K$S L L� <br /> RE: STATUS OF YOUR CITY OF EVERETT PERMIT(S) I SS—�G�n' /'�V E �UE -S�� !00 <br /> Job Address: 909 SIEVERS DUECY BLVD #D /�e I l C d,�t (N� g�00y <br /> Permit: B0912-023 DEMISING WALL BY OWNER <br /> E1001-038 Thermostat, Rama House (no inspections on file) <br /> (Please reference both permit number and address when calling or writing) <br /> According to our records, we do not have final approval for the permit(s) listed above. See the <br /> enclosed Inspection Activity Report(s). Sections 105.5 and R105.5 of the International Building <br /> Code and International Residential Code state that permits become invalid if the work is not <br /> commenced or is suspended or abandored ior more than 180 days. Work under your permits <br /> will no longer be authorized unless you: <br /> i) Demonstrate continuing progress by requesting inspection of work that has occurred since <br /> your last inspection, or <br /> 2) Request final inspections of the work that is completed, or <br /> 3) Submit a written request for a 180 day exCension, detailing justifiable cause for extension. <br /> It is your responsibility to ensure that permitted work is properly and safely completed, and that <br /> all require� inspections are performed. Please contact us by February 23, 2011 to <br /> request extension or to schedule inspections. After that time the file will be sent to <br /> microfilm without final approval. If you should decide to go ahead with the project in the <br /> future, you must apply for and purchase new permits, meeting current Code criteria. <br /> To schedule inspections call our automated inspection line at (425) 7.57-8881, or to discuss the <br /> status of your project, please cali our Permit Technicians at (425) 257-8810. <br /> City of Everett Permit Services <br /> cc: Rama House Restaurant Olympic General Contraccor G&S Heating Cooling <br /> 909 Sievers Duecy 61vd #D 372G Broadway #302 500 E Main St <br /> Everett WA 98203 Everett WA 98201 Monroe WA 9S�-'.: <br /> s:\mmcleod\letters\Ietters2011\exp2011-Ol.doc <br /> ENGINEERING/PUBLIC SERVICES DIVISION • 3200 Cedar Slreet•Everett,WA 98201 •(425)257-8800•Fax�•L- 3856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.