My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
400 SIEVERS-DUECY BLVD 2016-01-01 MF Import
>
Address Records
>
SIEVERS-DUECY BLVD
>
400
>
400 SIEVERS-DUECY BLVD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 8:02:17 PM
Creation date
3/9/2017 8:01:59 PM
Metadata
Fields
Template:
Address Document
Street Name
SIEVERS-DUECY BLVD
Street Number
400
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . . __ ._ ___ ___..�., __ . _ -- <br /> MEMORANDUM <br /> TO: Kirk Brooks <br /> FROM: Ryen Sass <br /> DATE: 24 March 2000 <br /> SUBJECT: Southwest Evarott Athletic Fields rSWEAF) <br /> Here'n tha project namtive you raqueated. <br /> Tha City of Everott and CSR Associated negotlatad an apreemeM that govsms the future <br /> davalopmer�t of the CSR ake. Thie developer aproemerrt also providsd for the donaHon to <br /> Evarett Parks of approximataly 84 Acroa of land south of Sbvers-Duecy BNd. <br /> Thie devaloper ayreement alao stipuletea that CSR Aaaociated will provide certain uNlities and <br /> improvemenri to tha eRe at apecific Umea. <br /> With regard to the SWEAF phaae 1 project now beinp circulated for pertnR rovfew,the <br /> egroement provides for the following: <br /> • CSR Aasociated will construct e watertnain in Sievers-Duecy Blvd to provida water to <br /> the projact ske by no later than July 15 2000. <br /> . CSR Associated will conttruct a sewsr main exteneion in Sbven-Duecy Blvd and <br /> Frontage ImprovemeMs coneisHng of a 5 lane conflpurallon atreet wideninp and <br /> sidewalke as approved by ths Cky Trafic Enpinser. This is requirod to be completed <br /> by no later than Odober 31 2001. <br /> . CSR Associated is responeibb for stormwater detsntlon and water quality irom the <br /> projact ske uMil such 8me ae a ropional detention and troatmer�t plan aro propared <br /> �y CSR and approved by the City. <br /> For our phase 1 project scheduled for construdfon this summx,we will be connedinp to the <br /> new watertnain due for compleUon by July 15". We wHl stub our tanitary side sewer out to the <br /> atraet RIW for connectlon whan the sewer the follovriny ysar when k is completed by Odober <br /> 2001. We will funcBon for the inidel period wfth portabls toibta until the sewer is connected. Our <br /> stortnwatar will discherpe into the exfatinp ditch system along Skvers-Guecy Blvd. <br /> If any questions arise, I'll be happy to try and answer them. <br />
The URL can be used to link to this page
Your browser does not support the video tag.