Laserfiche WebLink
i . ' <br /> I SfiANNON 8�'?��ON.INC. <br /> i GEOTECHNICAL REPORT <br /> � SOUTHWEST EVERETT ATALETIC FIELDS <br /> I <br /> EVERETT,WASHINGTOIV <br /> iI <br /> 1.0 INTRODUC'fiON <br /> T'his report presents the results of geotechnical engineering studies performed for the proposed <br /> athletic fields in Everett, Washington. The proposed expansion will consist of four 200-foot <br /> � ballfields, a field house, driveways and parking lots for 132 vehicles. Our concluaions and <br /> ', recommendations are based on our review of soil boring logs contair�ed in a geotechnical report <br /> �' by GeoEngineers,a visit to the site on March 19, 1999 and our engineering studies. <br /> i Our work for this pmject was accomplished in general accordance with our professional services <br /> agreement with the City of Everett dated January 25, 1999. <br /> 2.0 SITE AND PROJECT DESCRIPTION <br /> I <br /> � The Southwest Everett Athletic Fields site is located neaz the intersection of Sievers Duec:y <br /> Boulevard and Glenwood Avenue in Everett, Washington. The location is shown on the Vicinity . <br /> Map,Figure 1. The site is located within the westem corner uf the CSR Associated Inndfill <br /> along the south side of Sievers lluecy Boulevard. The location of the site within the lendfill is <br /> shown on the Site and Explorarion Plan,Figure 2. <br /> i The site is relatively flat and slopes gently down to the north. From south to north across the site <br /> ' thete is an elevatior.drop of about 15 feet. It is presenUy covered in grass and scnall btush. <br /> Occasional piles of rock and rubble are present across the site. There are two shallow drainage <br /> � swales extending across the site from south to north,generally draining surface water from the <br /> �teep slope bordering the south side of the site. A Site and F.xploration Plsn showing the site <br /> � topography is presented on Figure 2. <br /> , We understand that the proposed project will include fo�r 200-foot balfHelds w-ith surrounding <br /> � driveways,a parking lot, and a field house. The final grade of the ballfield areas will range from <br /> 564 feet to 562 feet. Achieving these grades will require making cuts of up to 10 feet along the <br /> � south side of the site and placing up to 7 feet of fill atong the north side of the site. The proposed <br /> site grades are shown on Figure 2. A field house will be located in the center of the ballfields <br /> � <br /> WR62R-OI.rpVwp/sjm W8628-01 <br /> I t � <br />