Laserfiche WebLink
i � <br /> � 3. Open 1he doors lo the vault and allow Replacement cartridges will be delivered to <br /> the system to air out for 5-10 minutes. the site. Information concerning how to <br /> I obtain the replacement cartridges is <br /> 4. Withoul entering the vault, inspect the available from Stormwater Management, <br /> inside of thc unit, including cornponents. Inc. <br /> � 5. Take notes about tl;e extemal and Warning: In the case of a spill, the worker <br /> inlernal condition o(the vault. should abnrt maintenance activities until <br /> � the proper guidance is obtained. Nolify the <br /> Be sure to record the Ievei of sediment local hazard control agency and <br /> build-up on the floor of the vault, in the Stormwater Management inc. immediately. <br /> fore6ay, and on top of the cartridges. If <br /> I flow is occurring, note the level of water To conduct cartridge reptacement and <br /> and estimato the flow rate per drainage sedime�t removal maintenance: <br /> ' pipe. Record all obs�rvations. <br /> ( 1. If appiicable, set up safety equipment to <br /> � 6. Remove large loose debris and trash protect pedestrians from fall hazards <br /> • � usiny a pole with a grapple or net on the due to open vault doors or when work is <br /> end. being done near ti�alkways or roadways, <br /> ` , . 7. Close and fasten the door. 2. Visually inspect the external condition of <br /> ;he unit and ttike notes conceming <br /> � 8. Remove safety equipment. defectslproblems. <br /> 9. Make notes about lhe locai drainage 3. Open the doors to the vault and allow <br /> I area relative to ongoing construction, the system to air out for 5-10 minules. <br /> erosion problems, or high �oading of <br /> other materials to thc� system. 4. Without entering the v2ult, g;ve the <br /> inside of the unit, including components, <br /> � 10. Finally, review the ccndition reports irom a general condition inspection. <br /> the previaus minor and major <br /> maintenance visits, and schedule 5. Make notes about lhe extemal and <br /> I cartridge replacement if needed. internal condition of the vault. <br /> � Major Maintenance Give particular attention to recording the <br /> level of sediment buiid-up on the floor o( <br /> '� , Depenoino on the con(iguration of the the vault, in the forebay, and on top of <br /> particular system, a workar may be required the intemal componenis. <br /> lo enler the vault to perform some tasks. : <br /> i , G. Remove large loose debris and trash <br /> ! Important; I( vault enlry is required, OSHA using a pole with a grapple or net on the <br /> rules for confined space entry must be end. <br /> followed. <br /> 7. Using a boom, crane, or other device <br /> Filter cartridc�e repiacem2nt shouid occur (dolly and rainp), offload the <br /> during dry wealher. Il mav be necessary to replacement carridges (up to 150 Ibs. <br /> plug lhe filter inlet pipe if base flows exist. each) and set aside. <br /> Standing water present in lhe vault should 8. Remove used cattridges from the vault <br /> be regarded as polluted and should be using one of lhe following methods: <br /> contained during this operation by <br /> temporarily capping the manifold <br /> ��onneclors. <br /> � Stormwater Nanagemenl, Inc.02A04 StormFilter Operetlon and Malntenance G�4dellnas 5 of 9 �. <br />