My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11500 SILVER LAKE RD 2016-01-01 MF Import
>
Address Records
>
SILVER LAKE RD
>
11500
>
11500 SILVER LAKE RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 8:17:12 PM
Creation date
3/9/2017 8:17:07 PM
Metadata
Fields
Template:
Address Document
Street Name
SILVER LAKE RD
Street Number
11500
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> CLOSED CM WORK ORDERS REPORT <br /> Total Utility Maintenunce Management System <br /> 10/12/1994 Page 1 <br /> ---------------------------�_---______-_________________________________________ <br /> Date Range :10/01/19°2 - 10/14/1994 <br /> CM Work Order RanaP :<Blank> - 8405421080229 Pattern :2001096330015 <br /> Item Range :<P,lank> - WW22020001 Patterr. :* <br /> Program ALL Function ALL Activity ALL <br /> -------------------------------------------------------------------------------- <br /> CM WdRK ORDER ID: 2001096330015 Title: REPLACE U-JOINTS LS25 <br /> «DUPLICATE PRINTING OF THIS WORK ORGER» � I�OU ���-VF� LAKE fZD <br /> Item ID: LS25020200 -- PUMP #2 <br /> Location ID: -- <br /> Proqram 200 Function 109 Activity 633 <br /> Date Completed: 10/12/1994 <br /> Overall Craft: ISM <br /> Issued: 04/21/1994 Issued by: TJC Assigned to: DJP <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> � Meter Reading: <br /> Downtime: 0 huurs <br /> status: <br /> Complaint: <br /> -------------------------------------------------------------------------------- <br /> REPLLACE U-JOINTS PUMP #1 & #2 <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> ISM A7P DE WITT, JAMES P. 0. 00 4.00 82.20 <br /> PSC TF TERSINA, FRANK (NMI) 0. 00 4.00 77.76 <br /> UL WMJ WRIGHT, MICHAEL J. 0. 00 4.00 58.24 <br /> Total Labor Cost: 218.20 <br /> Vehicles: <br /> ID Description Date Hours Cost <br /> ------------ ------------------------------ -------- ------ ---------- <br /> V2143 SVC TRUCK CHEV 87 W/ CRANE 04/25/1994 2.00 10.40 <br /> V2143 SVC TRUCK CHEV 87 W/ CRANE 04/26/1994 2.00 10.40 <br /> V2355 GMC 3/4 TON VAN 91 04/25/1994 2.00 9.60 <br /> V2355 GMC 3/4 TON VAN 91 04/26/1994 2.00 9.60 <br /> ---------- <br /> Total Vehicle Cost: 40.00 <br /> Total cost for work order 2001096330015: 258.20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.