Laserfiche WebLink
( ( <br /> � � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated_ <br /> 5. Connect�" '2 sewer per City Standard #601 <br /> �Connect side sewer per City Standard #'s 601, 602, 60�. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> �. Connect rooftop downspovts to the drainage system provided for this lot. <br /> (�Rooftop runoff must be dischargQd to a roof downspout infiltration system per City of Everett <br /> �� Storm Manual 3-2.6.2, Width�, Depth a �5;Length ,�: <br /> 10. The contractor must meet with the Public Works Inspector tu discuss potential drainage <br /> routing prior to beginning the project. <br /> 1 t. nstall erosion control measures as determined by the Public Works inspector, such as siit <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Ev�rett Standards for small parcels <br /> 1( DJRemove erosion control measures upon completion of the project prior to final approval of the <br /> �� permit. <br /> 14. II excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting oF inaterial is allowed on this building lot. <br /> 15. Remove and repiace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's fronta3e as directed by the Public Works InspeMor (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. install a Type I concrete driveway per City of Everett Standard #3A7. <br /> 17 Pave driveway frum the iront property iine out to the street paving. <br /> 18. Contact the Water District for c�nnecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system �s to be installed, the pressure line must dascharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> ��01 !'� �/GvE� ��'� ,C�c.�.J <br /> PWComments �L <br />