My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1822 SILVER LAKE RD 2016-01-01 MF Import
>
Address Records
>
SILVER LAKE RD
>
1822
>
1822 SILVER LAKE RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2017 8:46:11 PM
Creation date
3/9/2017 8:46:00 PM
Metadata
Fields
Template:
Address Document
Street Name
SILVER LAKE RD
Street Number
1822
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, � 1 <br /> ATTACHME!IT "A" <br /> 1. De[ailed drawings, in accordance vith Ci[y Design and Cons[ruc[ion <br /> Standards, shall be submitted to [he Public Works . Deparement <br /> shoving si[e parking layou[, landscaping, utilities, storm drainage <br /> and all required improvements in the public right-of-way. Public <br /> I�orks Depar[ment approval of these drawings is required prior to <br /> any permits being issued. All improvements shall be completed, <br /> approved, and varranted befure the Occupancy Permit is issued. <br /> /%� Full standard street improvemen[s are required to Silver Lake Drive. <br /> �� <br /> 3. Participation in the cost [o fund the sou[htnd sever interceptor is <br /> required. The approximate cost based on the nreliminary <br /> Q��( � _linformation provided is $219/unit. The actual cost shall be <br /> p �i� �j�y""computed by [he Puilding Department per the ordinance in effect a[ <br /> o � � �/� ��the time and accordin¢ to the infornation provided on the approved <br /> C�� � ��u/� plans on the date of permit issuance. <br /> �rF`��/� �� 4. On-site de[ention is not required. The storn drainaRe from the <br /> �� <br /> / � site must be collected and discharged into the lake throuch an oil <br /> (9��G� � � separator. <br /> /' <br /> n �//� �� 5. The projec[ mus[ provide the necessary parking stzlls �er Citv Code <br /> �/y!' � �• and design [hem per City Desien and Construc[ion Standards. The <br /> 'r�� / �( plan da[ed NovemEer 16, 1983 shall be modified to elimina[e space <br /> 5S� /� �k3 and resize soa�es 4 - 6 to a minimum size of 8-1/2 X 18-1/2 feet. <br /> N� � 6. A five foot iandscaping strip per Ci[y Desi¢n S[andards i� reauired <br /> r to screen [he parkine area perineters. <br /> / �7. A fire hydrant is required wi[hin 2C0 drivine Ceet , b�t not closer <br /> (7 [han 50 Eee[ oi every s[ruc[�re. <br /> 1 <br /> ���'J 8. Ci[y streets ar.d alleys are to 6e kept c!.ear oE dirt and debri> a[ <br /> a11 times durine constructio�. Dust suopression and street <br /> cleaning must occur as �iirec[ed by [he Public Works In=pector. <br /> 9. Performance guarantees are required for street and landscapinq. <br /> 10. A one-year guarantee is required on the public s[reet and <br /> landscaping Eor an amount not less than l0Y of the cost of <br /> construction and shall run for one year f.rom the date of issuance <br /> of the Eirs[ Occupancy Permit for the oroject. <br /> 11. A ten foot wide easement shall be provic!ed for a ouh! ic wa!4wav <br /> running from the east to wes[ proper[y line, para11e1 and adiacen[ <br /> [o [he ordinary high watermark of Silver Lake; this ea�ement to be <br /> activa�[ed at such [ime as easemen[s are ohtained from the wes[ <br /> property line of the subject property [o the Citti- park. <br /> 12. Activation of the said easement shall be on the addi[ional <br /> condi[ion [hat the Ci[y of Everett assumes and continues tbe <br /> responsibili[y Eor construction, maintenance, controi , and holds <br /> the private property owners harmless from any liability arising <br /> from such use. <br /> 13. That developmen[ be according to the site plan da[ed November ]F, <br /> 1983 as amended by this reoort. <br /> 14. Construction or substantial progress [oward cons[ruction of a <br /> project must be undertaken within two years after final approval of <br /> the permit and completed within five years. If the project has not <br /> been completed in this [ime span, the permit w?11 be reviewed by <br /> [he Planning Depar[men[ who will do one of the followin¢: <br /> - ex[end the permit Eor or.e year, or <br /> - termina[e Che permic <br /> � � <br /> ,� . �; �, <br /> � �'�r .�L t�,Cl',� <br /> nnis L. Derickson <br /> Planning Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.