Laserfiche WebLink
CliffLindman p� D�US-d� <br /> From: Dave Voigt <br /> Sent: Thursday, May 31, 2007 4:22 PM <br /> To: Mark S2dler; 'oren Postma; Don Hallsson; Greg Ahles; Tom Nevin; Rick OsEome; Frank <br /> Tersina; Gordon Witcher; Cliff Lindman <br /> Subject: Silver Way sewer af LS24 <br /> Gentlemen, <br /> Pursuanl to our meeting this morning, here's an update: <br /> City staff met at the site with the contractor and his engineer to discuss the situation regarding the sewer reach in the <br /> driveway and the forcemain thrust blocks. <br /> No excavations were made today during the site visit. It was agreed that the following action wouid be taken: <br /> 1. The contractor will excavate and place a trench box next to the manhole inside the LS site and expose the pipe stub <br /> (existing 12-inch diame.:er concrete)that goes NW down the driveway. Ha will dewater the hole as necessary for city <br /> access. <br /> 2. The contractor will do potholes and attempt to find the limits of the existing concrete thrust block on the 20-inch diameter <br /> forcemain nearest the street. <br /> 3. The City will inspect the exterior condition of the pipe(probably Friday)and its connection to the manhole. The City will <br /> break out the mortar plug and prepare the line for CCN inspection of the pipe. <br /> 4. The City will perform a CCN inspection of the pipe (next week), assess the condition and determine the approximate <br /> location of the stub end near the street. <br /> 5. If repairs on the pipe are needed, the City wili do that(next week). <br /> 6. With more accurate location in(ormation for the pipe stub and thrust block, the contractor and his engineer will <br /> determine if changes to the sewer alignment are necessary to avoid conflicts with the thrust block. Similarly, some <br /> changes to the pipe grade will be necessary to connect to the existing stiib. <br /> 7. The contractor will be off this site for a week or more which allows time tor the City to per(o�;n the above tasks. <br /> 8 The contractor has already sawcut Silver Way for the sewer trench and is commiK�d to the alignment per plans. <br /> Those are the main points as I currently understand them. <br /> Let me know if I missed anything. <br /> Thanks <br /> Dave <br /> DavidVoigf, P.E. <br /> SeniorEngi;ieer, Projecl Manager <br /> City ol Eveietl, Public Works <br /> Phone 425-257•8983 <br /> Faz:425-257-8882 <br /> [mail:dvoigt(�ilci.everett.wa.us <br /> 1 <br />