Laserfiche WebLink
P�lIBL/fC IIrAI�I�fS <br /> 0 <br /> MEMORANDUM ���n <br /> ��� ��/� <br /> TO: Dave Davi� F`'ry ,P //1) <br /> FROM: Den ivtathias� !'''op F �9'9 \!, <br /> ��„�t�,9�. <br /> DATE: Feb. 22, 1999 `ss���T' ... <br /> �s <br /> SUBJECT: Pacific Ave.Overcrossing stormwater Repon <br /> I reviewed the abovo-referenced rcport end discussed my commrnts with Jack Hurley over the <br /> photrc today. My commenu arc: <br /> 1) As much stonnwater runott'es�ossible should disctarged into the on-site detention <br /> facility that will be consducted at the Multi-Modal �lite on Smith Island. <br /> 2) Stormwater nu�off in the ar�a designated E3 in t!�e report should be dixherged <br /> directly into the combined sewer system,rnthec than into Eagle Hard�4are's detention <br /> system. <br /> 3) The repoR should inctude calculat%ons showing the amowt of incrcased impervious <br /> surface as a result of the proposed project. <br /> C.C.Kir,t Brooks <br /> na�eoozz2 <br />