My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3201 SMITH AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
SMITH AVE
>
3201
>
BASE FILE
>
3201 SMITH AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 3:55:13 PM
Creation date
3/9/2017 9:33:51 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3201
Tenant Name
BASE FILE
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> I <br /> process thall conoiat of a deterqent wash tap water rinte and <br /> I deioniaed water wseh-down. Rinoe water will be collected and dispo�ed of <br /> elong with any other wasteweter se epecified in Section 4 �7) . <br /> 7f2)C Quality 11��ur�ac� Pro[�ction Plan <br /> I Detai�o� t e gue ty aeeurance proceduree ohall be submitted in the <br /> QAPP as part of the RAMP. This plan at e minimum ehall include the <br /> analYticel detection limite and quality control pror.edures for the <br /> laboratory analyees_ <br /> I3 (3) Daily Samplina and Testing Report <br /> The Daily Semplinq and Teetin Report (DSTR) ehall be qenereted by on- <br /> I eite peraonnel reeponeible for soil eampling activitiee and �ubmitted to <br /> the Oaner's Repreeentative on a daily baeis durina period� wlun �oil <br /> � aampli� is occurring at the eite. At E minimum the DSTR sh�ll contain <br /> the following: <br /> I1. Sketch ehowing etockpile and eample locatione; <br /> 2. Liet of eamplee collected; <br /> I 3. Laboratory reeulte, and <br /> �. Diepoeition of all current etocknilee. <br /> I 4 (1) Notificstion <br /> The Contrecto: shall notify the Owner�s Repreaentative in xritino at <br /> leaet Cen (lo) workina daye prior to the date that excavation operatione <br /> are to begin, and identify the limite of thet excavation fixcav�tion <br /> I and aampling •hell not take place without a deoianated repre�entative <br /> from the Owner's Repreeeatative on site <br /> I �(2) DacuNnt�lic� o! i:cav�tion <br /> During excavatzon, t e Owner•o Reore�en[�[ive m�y dor,iment soil <br /> conditiona •lana the utili[y trench. Documentation may re�ire <br /> photographs of the trench eide wall discrete eide wall �w l_i�ng, a�nd <br /> I recording of additional asta. The Contrac[or m�y be requ rei d Co conduct <br /> the excavation operations in r manner that will a�ei�t in d�ta <br /> collection and oreeerve portions of the vork area for furthez te�t;ng <br /> and poeeible epecial. handlin of the cont�minated meterials Additional <br /> Imoney or contract t�me will not be allowed for this wrk. <br /> 4 (31 Ph sical Screer.in oE Debrie <br /> Debrie hao en observe throuahout the subaurfece Larae debris shell <br /> ( be seperetely stockpiled for immediete removal off site Debris-laden <br /> soil ehall be phye�cally ecreened eo that eoils that eub�equen[ly p�rs <br /> chemical screening can be reueed foz backfill io con�tituent level• are <br /> below MTCA Method B cleanup level¢. Debris •epara[ed from •oil �hall be <br /> I further eegregated for dieposition at a cons[ruction debria landfill <br /> facility for inert debrie and a municipal landfill facility or <br /> equivalent for organic debrie. <br /> I � (�)A 8tockpil• Coa�truction <br /> Excavate materiaT e1�?—be piaced in e[ockpiles at locations detexmined <br /> by [he Contrac[or. <br /> I <br /> I Division 2 p�ge 21 <br /> �erett Station — 05/12/0o I <br /> H:\Jobs\9709]\TRANS\fiNG\SPECS ,100\cd\&[reet site\9ESPECZRI.do <br /> • -1p6 <br /> I �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.