Laserfiche WebLink
i <br /> underliner, and filled with gravel. Liquid collected from the <br /> I eump {primarily incident rainfall and dewatering liquids) ahall be <br /> temporerily atored in a chemically compatible container. <br /> I 6. L�uid etorage containera ehall be watertiaht. Disposal of <br /> liquids will be in accordance with Section 4 (7) . <br /> �(4)H 8toc�il• 8� r� atioa <br /> I TT Ccntractor s a ta e all necessary precautione to avoid mixinq <br /> clean s�d contaminatec wae[ee based on field obaervatione and knowledac <br /> of site cunditione. The Contractor ehall minimize the aeneration of <br /> dangeroue waete to the maximum extent practicable. <br /> IExcavated material will be aegregated accordina to material type and <br /> aseumed quantity of contamination as determined in the field usinq <br /> I "common senee^ criteria (i.e. , odor appearance, color, preeence of <br /> aheen on water, etc.) or ae accepte� � the Owner'e Representative. <br /> 4(4)C Stockpil• Placw�nt <br /> I 'c e Contractor eEi71 eneure the protection of property in the areas <br /> designated for etockpilina. The Contractor ahall be held responeible <br /> for any property damage or destruction caueed by work in theae areae. <br /> Stockpilea ehall be conetrueted ia locatione tha[ meet the followina <br /> Irequiremente: <br /> For placement of etockpiles, the Contractor muet: <br /> I1. Construct stockpiles to be out of reach of ponded water that <br /> collecte in depreeeione on the eite• <br /> I 2. Construct etockpilee �o that tliey are readily accessible by <br /> equipment and stockpiled material can be traneported off site <br /> within one !1) workina day of zeceivina chemical anelysie reeults• <br /> I 3. Isolate each type of etockpiled material; <br /> 4. Allow room Eor inarese and eareee by construction eauipment via <br /> the etabilized construction entrance ehown on the Plans; and <br /> 5. Place atockpilee auch that no peraon would be able to climb from <br /> the stockpile over the cone[ruction fence. <br /> I �f4)D Stocl�il� Man�q�at <br /> stockpi e covers muee e eecured and be able to withe[and conditionr <br /> expected at the eite during the time freme eoil is to be stockpiled <br /> The soil stockpile is to be properly covered et all timee exceDt xhen <br /> Iwork is actually in pro reee •t the etockpile <br /> The Contractor shall inepect all etockpile accumulation areae daily �nd <br /> ehall maintain a written inspection loa. The inspection loa ehall be � <br /> made available to [he Owner's Representetive for review upon request. A <br /> copy of !he previous week's inspection loa shall be provided to the <br /> Owner•s Repreeentative et the weekly Proaress Meetinge. Inapection loas <br /> will contain da[e and time of ineeection name of individual conduetina <br /> the inspection, problema noted, and corrective actione taken In�pector <br /> i shall obeerve and document the following, at a minimum: <br /> Divieion 2 Page 23 <br /> Ever.ct seaCion os/lz/oo I <br /> H:\Joba\97093\TRANS\fiNtl\SP6CS\100\cd\Etzeet oite\98SPEC2RI doceti�?Rai6�C�#F{.� <br /> �e�-�T � <br /> I Q <br />