Laserfiche WebLink
I <br /> f <br /> 5. No diecharge of etored water ehall be allowed without firat <br /> I tranemitting the chemicel data to the Citv of Bverett Sewer <br /> Utility, for approval. <br /> I 5 Y���uros�at <br /> �.The unit of ineaeurc for Roadway and Site Excavation and <br /> 5tockpiling and Structure Excavation and Stockpiling and Phyeical <br /> Screening ehell be the ton. All excevated m�terial ehall either <br /> I be weighed, or nea[line meaeured in ttockpile or haulin vehicle <br /> and converted to tone by an a reed upon convereion factor. <br /> I 2. The unit of ineaeurement for debrie, diepoeal and non-reaulated <br /> material ehall be the ton, baeed on meaeuzed weight of material <br /> hauled off-eite. All material hauled awey by vehicle ehall be <br /> I weighed on off-eite cer[ified ecalea euch ae truck ecalea on <br /> higha•aye or at the diepoeal sites. The ecales ahall be of <br /> eufficient capaci� to permit weiahina the treneportina vehicle <br /> both empty and full. Claeees of material ehall not be mixed in any <br /> I given losd. Scalee ehall be of the type that will print weiah <br /> ticketa. A duplicate copy of each weiqh ticket ehall be turniehed <br /> to the Owner's Representative within three (3) working days of <br /> I receipt by the Contractor, ae well ae a cooy of the lateat ecale <br /> certification. <br /> 3. All coste aseociated with dewaterina ehall be ineidental to <br /> IStructure Excavation, Section 2-09 oc the�e �peeificationa. <br /> For contaminated water and oroduct ae collected from the vehicle <br /> I waeh facility and as detained as required ehall be inoidental to <br /> other items of work. <br /> 6 Da t <br /> I �yment will be made in accordance with Section 1-0� 1 for the following <br /> bid �.tems that are included in the proposal: <br /> I 1. "Roedway and Site Excavation and Stockpile" per ton ehall be full. <br /> paY for all labor and equipment co�ts to excavate and stockpile <br /> all material to be removed from the site or to be ueed ae trench <br /> beckfill. <br /> I2. "Structure Ezcavation and Stockpile" per ton ■hall be full oay for <br /> all labor and ecuipment coet• to excavate and �tockpile all <br /> material to be rem� ed from che eite or to be used a• trench <br /> backfill. <br /> 3. ^Phyeical Screening,• per cubic yard, ehall be full Day for all <br /> labor, equipment, and macerial coete to �ereen m�[erial to <br /> Ise�arete debrie from soil. <br /> 4. "Testing for NTPH-G/BTBX" shall be full pay for all labot <br /> Iequipment and material coste ae�ociated with eerformina thi■ teot. <br /> I Divieion 2 Page 79 <br /> �erett Station _ OS/12/00 I <br /> H:\Jobe\97093\TRANS\6NG\SP&CS\300\cd\StzeeG site\9lSPfiC2RI.doc�{;� <br /> I � <br /> � <br />