Laserfiche WebLink
Mhere water ie encountered in ehe trench, it ■hall be removed during <br /> I pipe-laying operatione and the trench �o maintained until the end� of <br /> the pipe aze sealed and provi�ions are m�de to prevent floating of the <br /> pipe. Trench weter or other deleterione materiale ehall not be allowed <br /> to enter the pipe at any time. <br /> IIt ehall be the Contractor�s responsibility to furnish, install, and <br /> operate all nece�eary machinery, eppliances, and equipment to keep <br /> excavations free from water during conetruction. <br /> Dewatering of the trench ahall be coneidered ae incidental to the <br /> construction and all coete thereof ehall be included in varioue unit <br /> Icontract pricea for the pipe linee. <br /> D�ddiaQ th� Pip� <br /> Section 7-08.3(1)C ie supplemented with the following: <br /> Bedding meterial for concrete pipe ehall be hwerett N2 washed coaree <br /> eand. Bedding material for PVC pipe ehall be cruehed eurfacing baee <br /> Icouzse. <br /> ehnr Lin� Coaa�etioa� <br /> Section 7-08.3(2)H ie eupplemented with the following: <br /> IWhen replacing an exieting eewer line, etorm drain liaee which are <br /> connected to the exieting sewer �y�tem, unles• otherwise epeeified, <br /> sh�ll be reconnected to the new �ewer in accordance with the Standerd <br /> ISpecificatione. <br /> The minimum eize of new etorm drain line ehall be 8". Vertical <br /> connections of drain line• to the eewer main� between manhole• dhall not <br /> Ibe allowed without prior approval by the �ngi�eefOwner'e Repreeentative. � <br /> Recomzection of drain line• �hall be conoidered as incidental to the <br /> I con�truction and all coets thereof �hall be included in various unit <br /> contract prices for the sewer pipe. <br /> I s•ekiiiliaq <br /> Section 7-08.3(3) ie eupplemented with the following: <br /> Backfilling shall be perfoxmed only after intpection and approval of the <br /> I inetalled pipe. <br /> 6xcavated material free from mud, muck, orgaaic matter, and h:oken <br /> pavement ehall be uaed for backfill, except where otherwi�e required by <br /> Ithe Sng�r-Owner�s Repzeaentetive. I <br /> Backfill ehall be excavated m�terial placed in the remainder of ehe <br /> trench ebove che bedding material, except where otherwira required by <br /> the Sngi�eerOwner�s Repreeentative. Hsckfill �lull be placed in � <br /> Ihorizoneal lifts and each lift mechaniully compacted by a powez- <br /> operated mechanical tamper(�1 ae �pecified in Section ]-03.3(141C e��he I <br /> ' ' ' z other mechanical comp�ction device �pproved <br /> I by the &ngi�ne�Owner�e RepreeenGative. The Contractor ehall take any <br /> neces�ary etepe to protect the excavated material from beeaning <br /> contaminated wieh moiature. <br /> Division 7 page 9 <br /> � Sierett station o5/12/0o I <br /> � H:\Jobs\97093\TRANS\ENC\SPECS\100�cd\Street tite\98SPEC7RI.doc <br /> i — �Z <br />