My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3201 SMITH AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
SMITH AVE
>
3201
>
BASE FILE
>
3201 SMITH AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 3:55:13 PM
Creation date
3/9/2017 9:33:51 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3201
Tenant Name
BASE FILE
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRANSMITTAL INC� <br /> FORM <br /> 100 1121h Av�rNw N.E. <br /> SWts�00 <br /> BNMvw.WA 9E00� <br /> PMorw: (!25)635-1000 <br /> Fuc (�25) 6351150 <br /> ro: City of Everett �ace: September 20, 1999 <br /> 3200 Cedar Street sub�oc� Everett Multi-Modal Transit Ctr. <br /> Everett, WA 98201 Existing 8 Proposed Utllities <br /> (Wate;, Sewer, end Srortn) <br /> Potential Conflict and Pmposed <br /> Potholing Locations <br /> A�� Mr. Kirk Brooks, Public Worlcs <br /> W�An Tnnsmlttlny: TM Followinp: Fp: <br /> X HerewRh X Printa or_Tracings X Revivw and Comment <br /> Under Sepatete Cover _ Co�structbn Drawings _ Approvel <br /> _ SpecHicatione _ Sipnature <br /> Shop Drewinga X Your Uee and F(les <br /> Numb�r o1 Copb�: Chanpe Order puotetbn <br /> t Sets _ Approved Bills Peyment <br /> 2 Sheeta __ Legel Dexriplions An Requested <br /> -- Letters Actian NMed Bebw <br /> Resumes <br /> Kirk, <br /> As requested, I am sending you e current plan showing existing and proposed (water, sewer, and <br /> storm) utility locadons to identify potential conflicts between our proposed stortn drainage system(sl <br /> and other utilities. Coordination efforts ro date have primerily been associated with Puget So�d <br /> Energy's (PSE's) 12" HPG ges meins and the existing 48" water main along the north side of 33n0 <br /> Street. Potholing of these two utilities (between Smith Ave. and the reilroed tracks) has been <br /> completed, though a couple of addfional spots along the 12" HPG have also been ident�ied for <br /> furthe;potholing in Smith Ave. and 32"° Street. (Transmittal to Jeff McFall 9/8/99). A copy oi this plan <br /> has s!so been sent to Elaine Babby at PSE for her use/files. <br /> As noted in our phone conversetion(s), our pmoosed storm system is now feirly well pinned down. <br /> Our main storm trunk (from the detention vault to Pacific Ave.) is limited by available cover conditions <br /> and utility conflicts (already iaentiHed), and cannot be altered very much. Based on this proposed <br /> system, we feel there may be some minor canflicts between the proposed storm system and exiadng <br /> water mains. The majority of these potential conHicts are located along 32nd and 33r° Streets, near <br /> McDougal. I have highlighted the potential conflict locations on the Plans, and assume you will <br /> coordinate the necessary potholing activities. Please review tha enclosed Plan sheets and give me a <br /> call (425) 635-1000, if you have any questions or would like to meet prior to any potholing to discuss <br /> our proposed facilities and/or locations. Thanks. <br /> Sincerely Yours, <br /> Tod S. utomi, PE - Project Engineer <br /> i.�nhqe�nuni4��nmmVnn.Ihl A�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.