My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3201 SMITH AVE BASE FILE 2018-01-02 MF Import
>
Address Records
>
SMITH AVE
>
3201
>
BASE FILE
>
3201 SMITH AVE BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 3:55:13 PM
Creation date
3/9/2017 9:33:51 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3201
Tenant Name
BASE FILE
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, �, � <br /> Jeff McFall <br /> March 1,2U00 <br /> Page 2 of 5 <br /> Occupancy <br /> I. (f the boiler in Room 501 exceeds 400,000 Btu per hour input, than door 501 should be shown <br /> as a minimum 60-minute rated assembly. Section 302.5 <br /> 2. The maximum occupant load from each assembly occupancy should be posted (and noted on <br /> the plans). Section 1007.2.6 <br /> 3. The door schedule should state which hardware groups are panic hardware. Section 1007.2.5 <br /> 4. Door 400G should swing in the opposite direction as shown �nd have panic hardware specified. <br /> Sections 10033.1.5, 1003.3.1.1 & 1007.2.5 <br /> 5. A smoke-control system meeting the requiremenu of Section 905 should be provided within <br /> the Atrium and arcas opening to the atrium. Special inspection should be provided for the <br /> smoke-conuol system in accordance with Sections 905.15.9& 1701.5, item 14. <br /> ConstrucNon <br /> 1. The fim-rcsistance of building elements es required by Table 6-A should be restated in the code <br /> infortnation section (as it applies to this building) so that inspectors and tradespeople may have <br /> a quick-reference. <br /> 2. Srecial inspection for the spray-applied fire-proofing as noted on Sheet S0.02 should be revised <br /> to reference UBC Standard 7-6. <br /> ' 3. The listing for the one-hour fire resistive roof-ceiling assembly used over the mulr.i-purpo�e <br /> room(room 400)should be provided. <br /> �. The listing for the composite steel and concrete deck floor-ceiling assemblies shuuld be <br /> provided. Section 710.1 <br /> 5. 'Che plans should show a minimum 1 '/:" concrete cover of all reiuforcing steel within the <br /> arches. Table 7-A, [tem 5-l.l <br /> 6. The enclosure surrounding Stair #2 has two instances where wall assemblies aze used for firei <br /> resistance in other than a completely vertical application(on the Second and Fourth Floor). The <br /> listing for the proposed wall should either show that the wall was tested as the proposed uses <br /> indicate (horizontal and at a 45deg. angle), or the assemblies should be that required for a <br /> minimum two-hour fire-resistive floor-ceiling assembly. Sections 101.3 & 104.2.9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.