Laserfiche WebLink
i, <br /> protection of the existing storm water vaults. The plan at that time was to construct the <br /> BRT platform partially on top of the existing vaults. However, the plan was subsequently <br /> revised to construct the platform further north,well away from the existing vaults. Bus <br /> traffic will pass over the vaults, but no structures will be constructed close enough to <br /> impact them. <br /> This memorandum documents the BRT projects compliance with the City of Everett's <br /> storm water regulations by virtue of the mitigation in previous projects and its location <br /> within the combined sewer area. No additional storm water report is intended as there is <br /> no design or calculations to be documented. Stormwater collection plans and temporary <br /> erosion control measures will be shown in the construction plans. <br /> S�rift 13R'I'ronli'I'crminal at I:rcrcu Station Page 2 <br /> Uncumcn�ation of Stonmrater Standards Compliance Storniwaler Technical Memo <br />