Laserfiche WebLink
C- 3TRUCTURAL DESIGN A5 ►CIATES� INC. <br /> , . NSUlTINO ENOINEERB '— j <br /> auo��wrH@r.xw. r.o.eoxsse I <br /> �rNNw000.w�wae • vNor�e:�3aeins�u� <br /> October 9, 1987 <br /> Evergreen Movinq Systems, Inc. <br /> attn: Mr. Hill Brown, President <br /> 3719 Smith Avenue <br /> Everett, WA 98201 <br /> subject: Proposed New Facility <br /> Smith Avenue, Everett, Wash. <br /> Our ref. : 83-987 <br /> I, FFI D11V IT <br /> This office, an engineering corporation, licensed in the , <br /> State of Washington hereby declares upon verification with <br /> the City of Everett Planning Lepartment, that the following <br /> described property IS NOT SITUATED IN TS1E 100-YEAR FLOOD <br /> PLAIN. <br /> THE SOUTH ONE-THIRD OF THE NORTH BALF OF THE WEST 120.00 FEET <br /> OF BLOCK 19� J.S. SINES ACRE TRACTS� ACCORDING TO THE PLAT <br /> THEREOF AS RECORDED IN VOLUME 4 OF PLATS� PAGE 11� RECORDS OF <br /> SNOHOMISH COUNTY� STATE OF WASHINGTON. , <br /> TOGETHER WITH THAT PORTION DESCRIBED AS FOLLOWS: <br /> COMMENCING AT THE NORTHWEST CORNER OF SAID BLOCK 19; THENCE <br /> SOUTH ALONG THE WEST LINE OF BLOCK 19� A DISTANCE OF 200.0 <br /> FEET TO THE TRUE POINT OF BEGINNIAIG; TflENCE CONINUEING SOUTH <br /> ALONG THE WEST LINF. OF SAID BLOCK 19, A DISTANCE OF 15.00 <br /> FEET; THENCE EAST A DISTANCE OF 120.00 FEET; THENCE NORTH A <br /> DISTANCE OF 15.00 FEET TO A POINT THAT BEARS EAST FROM THE <br /> TRUE POINT OF BEGINNING; THENCE WEST A DISTANCE OF 120.00 <br /> FEET TO THE TRUE POINT OF BEGINNING. <br /> Respectfully submitted, <br /> STRUCTIJRAL DESIGN ASSOCIRTES� INC. <br /> by: <br /> i <br /> ase Vanden Ende, P.E. <br /> president <br /> KVE/jme <br /> STRUCTUNAL LhGWEERiNG DESIGN ANO INVESTIGATION <br /> OUILDwGS � FOUNDATIONS • RETAINING WAlLS • BRIDGES � PIERS � DOCKS • fOWERS • T.4NK5 <br />