Laserfiche WebLink
( � . <br /> lanuary 25, 2000 <br /> Ken Salo <br /> Evergreen State Sheet Metal <br /> P O Box I508 <br /> Everett WA 98206 <br /> Subject: <br /> Project Rodgers Electric <br /> 1ob Address: 3826 Smith <br /> Plan Check No. M0001-035 <br /> Dear Mr. Salo: <br /> In response to your application for a construction permit, your plans have been re- examined and yoc <br /> are advised that the issuance of a permi[ is being withheld for the reasons listed on the a[tached. Theae <br /> comments address building issues only. Additional revisions or additions may be required by other <br /> departments (such as Utili[ies, Planning or Fire). All references refer to the 1994 Uniform Building <br /> Code, as amended by the State o[ Washington and/or Washington State Energy Code 1994 Edition, <br /> unless stated otherwise. <br /> In order for the processing of your applicstion to continue, it will be necessary to provide the <br /> Building Division with two complete new sets of drawings retlecting the <br /> corrections requested. <br /> Sheet A3.1 of the approved building plans state that the maximum roof top load for mechanical units is <br /> 395q. The engineer of record sliouid submit calculations justifying the proposed unit weight of 568 <br /> pounds (total). Lateral loading should also be accounted for in the holddown design. Section 1632.1. <br /> Prepare a response letter showing where each item in this correction letter is addressed on the plan set. <br /> Upon submittal of the drawings, your application will be given prioriry and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure that the <br /> proposed strucwre will be constructed in compliance with all adopted codes. <br /> Sinccrely, <br /> T� � <br /> Associate Engineer <br /> TL;M(q01-O75 <br />