Laserfiche WebLink
PUBLIC WORK <br /> Item Unit Quantity Unit Price Amount <br /> PAVING <br /> AC Pavement Patching(includes <br /> removal of oid pavement) S. Y. Z r'1 Z. 12.00 �j�—A�- <br /> 4"crushed rock S. Y 4.00 <br /> 6"crushed rock S. Y. 6.00 <br /> 2"Class B S. Y. 4.00 <br /> 3"Class B S. Y 6.00 <br /> 4: Class B S. Y. 8.00 <br /> Bank Run Gravel, 3" (screened) in <br /> place C.Y. 7.50 <br /> 5/8"crushed rock, in place C.Y. I5.00 <br /> Saw Cut AC pavement Ft. 2.00 <br /> Other <br /> PAVING TOTAL S 35� <br /> CURB& GUTTER <br /> Curb and gutter L.F. �� 9.00 � 2�v n <br /> Other <br /> CURB AND GUTTF,R TOTAL S I 2�� <br /> . 5 �1 <br /> U <br />