My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3901 SMITH AVE 2018-01-02 MF Import
>
Address Records
>
SMITH AVE
>
3901
>
3901 SMITH AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2022 11:50:22 AM
Creation date
3/9/2017 10:46:16 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3901
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y.. <br />,o Bob Landles, Planning Department <br />PublicWorks Department 691,05 l }7 <br />NAIL March 12, 1980 <br />nUBJLG' S.E.P.A. Checklist Review #189 <br />Planning File #80-9 <br />PROPOSAL: <br />LVEAVLWASHINGTGN <br />1,4F�F.: ,19b <br />CITY or r-'VLRETn <br />To construct a one story 12,000 square foot warehouse building with office <br />at southwest corner of 39th and Smith. <br />RECOMMENDATIONS: <br />It is the recommendation of the Public Works Department that issuance <br />of a Negative Declaration be subject to the following; <br />1. A detailed drawing shall be submitted to the Public Works Department <br />showing parking layout, landscaping, driveways, utilities, storm drainage, <br />and all required improvements to the public right-of-way. Public Works <br />Department approval of these drawings is required before any permits <br />are issued. All improvements shall be completed before the Occupancy <br />Permit is issued. <br />2. City streets are to be kept clear of dirt and debris during construction. <br />3. During construction, all truck traffic to and from the site within the <br />City of Everett shall be on arterial streets unless otherwise approved <br />by the Public Works Department. <br />4. On -site detention and a temporary erosion control plan are required. <br />Drainage calculations are to be submitted on a City of Everett drainage <br />plan submission form. <br />5. Participation in the program to fund the north and south central sanitary <br />sewer interceptor is required. <br />�i Street im provements in conformance with City Ordinances are required. <br />Amend Checklist As Follows: <br />11 - 13 - c, d and f - change to yes. <br />Information For Developer: <br />A fire hydrant is required within 200 feet of; but not closer than, 50 feet of all <br />buildings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.