My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4001 SMITH AVE 2018-01-02 MF Import
>
Address Records
>
SMITH AVE
>
4001
>
4001 SMITH AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 8:28:57 AM
Creation date
3/9/2017 10:52:56 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
4001
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ; , Public Worics Department <br /> / � Utilitie�Divisioc,3200 Cedar Stmt <br /> COST ESTIMATE SHEET �/�/L �°���� Everctt,Was6ington 98201 <br /> (42�257-8800 <br /> Receipt # �3�,Su� Date Paid � <br /> X Cost of Work Order 3,365.00 Work Order # <br /> Cost of Service Order Secvice Order# <br /> Contact Person Kim Henderson Telephone # 252-7226 <br /> Requested By Paul McKee Date ofRequest 3-1&98 <br /> Property Owner(name) Kim Henderson <br /> Charge Cost to(name if different than owner) <br /> Address 9!5 61st Ave SE Ciry Everett Zip 98205 <br /> Installation Location 400I Smith Ave a,liS '�0 � <br /> Installation rype/description/sizeletc. Hydrant installation. Expose 6"main in Smith Ave,hot tap and install conCol <br /> valve, install 15' (t)6"DI pipe and hydrant,restore area. <br /> � The following estimate is bas_d upon the Utilities Division providing all labor,equipment,materials, <br /> restoration,and final hook-up. <br /> ❑ The following estimate is based upon the Street Division work group providing all labor,equipment, <br /> materials and restoration to property. <br /> Please noH[v t6e CiN of Everett Utilities Division 10 workine davs in advance of reauired installallon date to <br /> allow Cor scheduline aod narb arocurement <br /> Whenevcr the atimated cost i� not sufficient to cover the total ezpeose for ILbor, material, equipment rsntal and <br /> administntive cosa, t6e deficit shall be c6arged to the property for which such iusmllatioo wa� made aod t6e owner <br /> thercof,and provided further,t6at auy e:cess payment shall be rcturned to the person applyiog for the inshllatioo. <br /> "Deposit must be paid prior to ordering parta or scheduling work. <br /> cc: Bldg.Pe[mit Center <br /> Clair Olivers <br /> Labor& Benefits 1,080.00 Tam Thetford <br /> Material 1,791.00 Kiric Brooks <br /> Gordon Witcher <br /> Equipment Rental 494.00 Dan Lowell <br /> Surface Restoration ` Stw Mitchell <br /> Paul McKee <br /> TOTAL * 53,365.00 Gecry Cnun <br /> Alan Locke <br /> Prepared by: Gerty / Date Est. <br /> Accepted by: Preoared: Representing: <br /> 3-19-98 <br /> ESTIMATE GOOD FOR 6 MOIYTHS <br /> CosTncNO.GC1 sruuLwn 9Ne) <br /> S <br />
The URL can be used to link to this page
Your browser does not support the video tag.