Laserfiche WebLink
ATTACHMHNT -e' <br /> CONDITiOHS F&OH SHOEBLINE SQBSTANTI9'L <br /> DEVBLOPlIF.NT PSBMIT BIVEBFBONT p!SR <br /> 1. That the projec[ be develnped according to the site plan attached as Exhibit 1l7. <br /> 2. That all outside dike faces shall be hydroseeded and that all other vegeta[Lon <br /> dis[urbed ducing cons[ruction is replaced ia ldnd. <br /> 3. Detalled ]andscaping p]ans shxll be reviewed and approved by the Planning <br /> Departmen[ pdor [o issuance of any building permits showln.g p]antL.g de[ails <br /> around a11 proposed buildings, [he hydroseed misture proposed for the outside dike <br /> face and the general Reatment preposal for other area; dis[urbed during <br /> construc[Lon. <br /> 4. All utllity services provided for the park shall be un�.^.r�rounded. <br /> 5. Beyond fifteen (15) fee[ from any s[ructure the f3]1 shaLL be no ]nWer than one (1) <br /> foot belnw the regulatory flood procectron eleva[lon. <br /> 6. The H]1 shall be two (2) feet above the regulatory flood pro[ection eleva�on ior. a <br /> distance of fif[een (15) feet beyond all s[ructures Sn any direc[ton. <br /> 7. That [he first flnor of all s[ructures sha11 be [wa feet above the regulatory flood <br /> protectl.on ele��ation of 11 feet. (N G V D 1929) <br /> 8. Compliance with Fede:al Regula[tona Title 24 (CFR) Sec[ton 60.3 is required. <br /> (Federal Flnod Insurance Regula[ions) <br /> 9. All dikes shall be cons[cucted to be two feet above the regulatory flood protectton <br /> eleva[ion. <br /> 10. The applicant shall provide a coatinuous paved pedestdan/bikeway adjacent r.o the <br /> main chac;nel of [he Snohamish River eatending north [0 12th Street N.E. and <br /> south to the southern [erminus of thc subject property. This [railsysteo must be <br /> desigced to Parks Departme¢C specifications. <br /> 11. The City shall provide temporary eroston cont=olin the form of bddging across all <br /> drainage ditches and by placement of silt fencey in and around drainage ditches as <br /> necessary to prevent drainage from the project site into adjacent ditches. <br /> Constzuction aa[er sha1L be pumped into ]agoons or settiement ponds. The City <br /> shalt protec[ surrounding vege[atLon from eroslo❑ runoff from [he constructton <br /> area [hrough the ins[allatron of s[lt fences, haybales, e[c. betcteen the <br /> cons[ruction area and the surtoundin� vege[ated areas. <br /> •-1- <br />