My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5010 SOUND AVE 2018-01-02 MF Import
>
Address Records
>
SOUND AVE
>
5010
>
5010 SOUND AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2022 12:54:30 PM
Creation date
3/9/2017 11:24:59 PM
Metadata
Fields
Template:
Address Document
Street Name
SOUND AVE
Street Number
5010
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />PUBLIC WORKS PERMIT <br />Cry of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />Date. <br />5/17/2010 <br />Public Works Permit #: <br />PW1005-013 <br />Building Permit#: <br />C1005-011^ <br />Planninq Reference#: <br />Public Works Fee $: <br />$ 25.00 <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />SWARDSTROM,HANNA <br />5010 SOUND AVE <br />EVERETT WA 98203 <br />PHONE: 42535415 PHONE: <br />TAX PARCEL ID # 00433600005300 SITE ADDRESS: 5010 SOUND AVE <br />DESCRIPTION OF PROPOSED WORK: <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 F- <br />4. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm Manual W <br />3-2.6.2, The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for more details. <br />5. The contractor must meet with the Public Works Inspector (call Randy Allen at 425-339-7403) to discuss potential <br />drainage routing prior to beginning the project. V] <br />6. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw bales,- <br />swales, or erosion blankets. <br />7. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />8. No dirt, mud, rocks or debris to be tracked onto roadway. <br />H , <br />cn =0 <br />r� <br />�- <br />�-� C& - 7- <br />Appr e or�nstr (Date <br />FINAL INSP TION Date <br />Approved as Constructed <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, ex(K((��nses, or causes of action that may arise <br />because of installatrt and maintenance of the improvement <br />or othery',ght-of-wa u f e hereto applied for and further agrees <br />to re sarve upkn olice from the City and to replace <br />Signature of <br />(0 - -Z T <br />Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN ISO DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.