Laserfiche WebLink
4 <br />INSPECTION REPORT <br />Date P� L Permit <br />-v� t <br />Contractor: t S, <br />ELECTRICAL <br />❑ Temp Service <br />❑ Groundwork <br />❑ SlablConduil <br />❑ Rough In <br />❑ Service <br />❑ Grounding <br />❑ Ceiling Grid <br />XElectrical Final <br />SITE WORK <br />❑ Footing drains <br />❑ Roof drains <br />TYPE OF INSPECTION REQUESTED <br />BUILDING <br />MECHANICAL <br />❑ UFER ground <br />❑ Groundwork/Stab <br />❑ Footing <br />❑ Rough in <br />❑ Foundation <br />❑ Coiling Grid <br />❑ Structural Slab <br />❑ OK to insulate <br />❑ Framing <br />❑ Rooftop Units <br />❑ Insulation <br />❑ Mechanical Final <br />❑ Drywall Nailing <br />❑ Shear Nailing <br />❑ Roof Nailing <br />❑ Ceiling Grid <br />❑ Building Final <br />OTHER OR CONSULTATION: <br />PLUMBING <br />❑ Groundwork/Slab <br />❑ Rough In <br />❑ Coiling Grid <br />❑ OK to Insulate <br />❑ Water Service <br />❑ Medical Gas <br />❑ Plumbing Final <br />GAS PIPE <br />❑ Rough In/Service Hot Water Tank <br />❑ Refrigeration ❑ Rough In <br />❑ Gas Pipe Final ❑ HWT Final <br />❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR T.C.O. ;-<CORRECTION REQUESTED <br />El OK FOR C.O. IJ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: <br />n CALL (425) 257-8881 FOR REINSPECTION .24 hour notice required <br />C» <br />Inspector:Date: <br />EIR (4,'09) ALL1= '^LL r+�sAr uworu.�s. uc,san.�wM <br />