Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />` 4�� Connect side sewer per City Standard #601. <br />5. Connect side sewer per City Slandard #'s 601, 602, 604. <br />6. Connect all rooftop downspouls to the side sewer. <br />7. ' Connect rooflop downspouts to the drainage system provided for this lol. <br />8. Rooftop runoff must be discharged to a rocf downspout infiltration system per City of Everett Storm <br />Manual 3-2.62. ihe approximate size trench is 3.5' wide, 2' deep and 25' long. See attachmenl for <br />more details. <br />9. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior <br />to beginning the project. <br />10. Install erosion control measures as determined by lhe Public Works inspeclor, such as silt fence, <br />slraw bales, swales, or erosion blankets. <br />11. Install erosion control measures per City of Everett Standards for small parcels <br />12. Remove erosion conlrol measures upon completion of the projecl prior to final approval of the permit. <br />(13. �, All excavated material from foundation, sidewalk and driveways shall be hauled lo an approved, <br />�- ' permilted site. No wastiny of material is allowed on this building lot. <br />14. , No dirl, mud, rocks or debris to be tracked onto roadway. <br />,.�, . ,�. ,,�. .- <br />15. No building malerials to be slacked on sidewalksand sidewalhs to be kept clean and open for <br />pedestrian travei. <br />16. <br />17. <br />18. <br />19. <br />20. <br />21. <br />22. <br />Adjust water meter box 1" above sidewalk grade. <br />Remove and replace curb, gutler and sidewalk as per City of Everett Standard Plan #'s 305A & 306 <br />on tliis proposal's frontage as directed by ihe Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />Install a Type I concrele driveway per City of Everett Slandard #307. <br />Pave driveway trom the front property line out lo the street paving. <br />Contact the _ <br />sewer services. <br />Water District for connecting provisions for this building's water and <br />A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan tt410 is required for <br />the parking area. <br />If a sewer pump system is lo be installed, Uie pressure line must discharge inro a privale manhole, <br />then gravity Oow across lhe public right•of•way. <br />A sprinkler system is required tor this building in compliance with the requirements <br />'V <br />