Laserfiche WebLink
� <br />CLASED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System page 1 <br />03/29/1994 <br />mzmsaxsaszaasaszs�cescr�:-zac:aasson-avassssas�azas�a�s�ssas�a•s�a�as:saas� <br />Date Range :03/O1/1992 - 03/27/1994 <br />CM Work Order Range :<Blank> - 8405421080229 Pattern .*101256730112 <br />Item Range :<Blank> - S�1P122020001 <br />Proqram ALL Function ALL Activity ALL <br />��:==a�: ��_�'���=n��=��� <br />cxa::maa�vscee�axaaaseas�:s:�a��ss�s <br />CM WORK ORDER ID: 7101236730112 Title: INSTALL DRAIN LINE / 5608 SOUND AVE� <br />Item ID: " <br />Location ID: " Activity 673 <br />Program 710 Function 123 <br />DBte Complated: 03/23/1994 <br />Overall Craft: <br />Iseued: 12/13/1993 Iesued'b_•� HDA Assigned to: <br />out of service? No Priority: Travel Time: 0.00 Hr. <br />Me.ter Readinq: <br />Downtime: 0 houre <br />Staius: HL <br />Labor: <br />Craft ID Nama <br />----- ------ ---- <br />HEO <br />UL <br />UL <br />UL <br />EO <br />UL <br />UL <br />UL <br />HEO <br />EO <br />UL <br />UL <br />SUP1 <br />AAL <br />CJfi <br />GCR <br />HDN <br />MJL2 <br />MV7E <br />MWT <br />NCR <br />SDD <br />SR <br />SSJ <br />SWF <br />WLK <br />ARNOLD, ARTHUR L <br />CASE, JAMES E. <br />GRENZNER, CHR2S R•. <br />HARRIS, DANIEL N. <br />MITCHELL, JEFFREY L. <br />MOORk„ WARREN E. <br />MCMANIS WILLIAM TIMO <br />NIETHAMER. CHARI+�S R. <br />STECHER� DANIEL D. <br />SIERRA, R7�ION (NLQI) <br />SMITH, STEVE J. <br />SPADY, WILLIAM E. <br />WARNER, LARRY K. <br />Materials: <br />ID-_. ------- <br />BRIC00061156 <br />CEME000614 3 B <br />CENE00061438 <br />CONC00061338 <br />CONC00061338 <br />COUP44300147 <br />COUP44300147 <br />COUP44300747 <br />COUP44300747 <br />COUP48301547 <br />ELL044303447 <br />ELIA44303647 <br />gLI,046302247 <br />Description <br />Planned Hrs <br />-----�------------------ <br />BRICK CONCRETE 2" X 4" X 8° <br />CEMENT 20 MIN. SET 50 LB. BAG <br />CEMENT 20 MIN. SET 50 LB. BAG <br />CONCRETE MIX 60 LB. BAG <br />CONCRETE MIX 60 LB. SAG <br />COUPLING 6„ CONC X 6° Cl/PL <br />COUPLING 6N CONC X 6" Cl/PL <br />COUPLING 6" X 4" Cl/PL <br />COUPLING 6" X 4" Cl/PL <br />COUPLING 10" CONC X 10" Cl/PL <br />ELL 6° 45 DEG SP X GASKETED <br />ELL 6° 22 1/2 DEG SP X GASKET <br />ELL 8" 22 1/2 DEG SP X GASKET <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Actual Hre <br />-----72.00 <br />2.00 <br />34.50 <br />12.00 <br />29.00 <br />15.00 <br />62.00 <br />170.00 <br />6.00 <br />161.00 <br />62.00 <br />116.00 <br />2.00 <br />Total Labor Cost: <br />Date � Used <br />O1/12/1994 <br />O1/19/1994 <br />02/03/1994 <br />O1/12/1994 <br />O1/21/1994 <br />01/12/1994 <br />O1/21/1994 <br />O1/19/1994 <br />O1/21/1994 <br />O1/12/1994 <br />O1/21/1994 <br />O1/21/1994 <br />O1/12/1994 <br />24 <br />1 <br />1 <br />8 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />3 <br />3 <br />2 <br />Cost <br />1333.44 <br />26.04 <br />423.37 <br />164.04 <br />496.19 <br />203.25 <br />908.80 <br />2108.12 <br />109.56 <br />3113.40 <br />886.02 <br />1717.68 <br />42.24 <br />11532.15 <br />Cost <br />--_---9.84 <br />10.40 <br />10.40 <br />17.12 <br />2.14 <br />5.94 <br />5.94 <br />17.46 <br />34.92 <br />20.94 <br />13.65 <br />11.25 <br />28.34 <br />