Laserfiche WebLink
� 4�JSTING Nov � s tss� <br />CLOSED CM WORR ORDERS REPORT <br />Total Utility Maintenance Management System <br />09/04/1997 Page 1 <br />Date Range :12/03/1900 - OS/20/1997 <br />CM Work Order Range :1001091070001 - UT0021-35- Pattern :7101196649291 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />________________________________________________________________---------- <br />CM WORK ORDER ID: 7101196649291 Title: SO .75 INCH 5738 SOUND AVE <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 119 Activity 664 <br />Date Completed: OS/18/1997 <br />Overall Craft: <br />Issued: 03/25/1997 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL CSG <br />DL II GDK <br />WST LDS <br />WST WDT <br />i <br />Materials: <br />ID <br />ADAP34000547 <br />BOX000065547 <br />CORP34001847 <br />COUP34003947 <br />COUP34004047 <br />ELL034101447 <br />METE36089447 <br />N/A <br />PIPE34060647 <br />SADD44016847 <br />SETT34033647 <br />Vehicles: <br />ID <br />V2117 <br />V2119 <br />V2226 <br />VH0003 <br />VT0007 <br />Issued by: Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />------------------------------ <br />CAVANAH, SHANE G. <br />GOOD, DANIEL K. <br />IAFLING� DELMAR S. <br />WALDEN, DAROLD T. <br />Actual Hrs <br />19.00 <br />1.00 <br />18.00 <br />18.00 <br />Planned Hrs Cost <br />----------- ---------- <br />0.00 259.37 <br />0.00 8.00 <br />0.00 392.58 <br />0.00 382.14 <br />Total Labor Cost: 1042.09 <br />Description <br />------------------------------ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />BOX METER CONC W/STEEL LID <br />CORP STOP 3/4" CCT X INSTA @ <br />COUPT�ING 3/4" 1/4 BEND COPPER@ <br />COUPLING 3/4" 1/8 BEND COPPER@ <br />ELL 3/4" 90 DEG BRASS " <br />ME'I3R 5/8" X 3/4" NEPTUNE T-10 <br />'PRACING WIRE <br />PIPE 3/4" POLY I.P.S. <br />SERVICE SADDLE 6° W/3/4" CCT <br />SETTER COP 5/8" X 3/4" (H12") <br />Description <br />------------------------------ <br />91 CHEV 1-TON HYD UNIT <br />91 CHEV 5 YD <br />88 FORD DUMP 5 YARD <br />94 CAT BACKHOE <br />94 ATLAS COMPCO COMP. <br />Date # Used Cost <br />-------- -------- ---------- <br />08/14/1997 3 25.14 <br />OS/14/1997 1 49.62 <br />08/14/1997 1 15.34 <br />08/14/1997 1 7.53 <br />08/14/1997 1 6.62 <br />08/14/1997 1 1.36 <br />OS/14/1997 1 30.67 <br />08/14/1�7 48 5.2fl <br />08/14/1997 4II 9.60 <br />08/14/1997 1 11.38 <br />08/14/1997 1 51.91 <br />Total Material Cost: 214�4 <br />Hours Cost �u' ' I� <br />------ ---------- <br />19.00 100.70 <br />10.00 108.00 <br />8.00 83.20 <br />18.00 435.60 <br />8.00 39.20 <br />