Laserfiche WebLink
PUNCH LIST <br />DA1'E: July 10, 1996 <br />PROJECT: Broadwav South Condominiums <br />CONTRACTOR: Excell <br />CONSTItUCTION INSPECTOR: <br />TI'EM <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />Carroll Tollefson _ <br />Seed side slopes on BroadwaY <br />Restoro asphalt D/Ws oi: Rroadway <br />Finish street taper on Broadwav per ulan <br />Install asphalt wheelchair ramp on Broadwav per plan <br />Finish mudding up CB tops and clean out CB <br />Backfill ali sidewalks <br />Install water valve bozes in the street <br />Remove rocks and concrete behind S/W on Spokane in front <br />of 401 <br />Backfill edge of asphalt on Spokane — <br />Ro-rail or install steps tiehind S/W on Beverly Blvd. where <br />missing <br />Redo rockerv behind and under S/W on Beverly Blvd. <br />Instali loop detecWr <br />Raise M/H frame and lid to grade on Broadway <br />Install striping per Ed Sebers (Traffic) <br />Instal136" square concrete pad around hydrant <br />Compieted by <br />Date <br />