Laserfiche WebLink
RCN ITECTS <br />CH.4RLES MORGAN 8c ASSOCIATES <br />7301 BEVERLY LANE EVERETT, WA. 98203 <br />May 1. 7995 <br />Mr. Steve Ingalsbe <br />Assfstunt Planner <br />Cily cf Everett Planning Dept. <br />Wall Street Building <br />Eve:�ett, WA 98201 <br />Re: Broadway Soulh Condominium - Tracing 1t 48003 <br />bear Steve: <br />Phone (206) 353•2888 <br />EnGosed are 4 copies of a revised site plan and revised landscaping plan for►he "Broadway Soulh" <br />,Bondominlum project. Also enGosed is a copy of the revised civil drawings. 1�Ve have incorpAl�t�the <br />changes that you suggested. We have increased the setback on the noAh property iines to refled ihat <br />the setback is 10' and it witl heve Type I landscapfng. Also we have added a note stating that a 8' �gh <br />chain Iink fence will be inslalled alony the north prOperty line. <br />We heve replaced the rockery noAh of Building #�4 with a retaining wall not to exceed 38" in heipht. The <br />driveway north of Building N4 has been reduced to 28' and ihe building has been moved 7 to the south. <br />The driveway along the north side of Building fk3 has been reduced to 15' in width. <br />The p1o)eCt is to be e condominium and the individual owners will be responsible for their own trash <br />conNiners. <br />The school mitigation fee will be paid by the developer when the pertnR is ready to be issued. <br />We are sending 3 sets of the revised civil drawings to Kirk Brooks in Public Works at thisMme. <br />If ther� are any more questions, please coMact our o�ce. <br />Sincerely, <br />harles E, an <br />CENUbjm <br />cc: Kirk Brooks, Public Works Dept, City of Everett <br />o �6��dC� D <br />� 0 5 <br />MAY 1199 <br />........ ..................................................... <br />CITY OF EVER�TT <br />Bldg. Parmit Counter <br />UCENSED: WPSHINGTON • OREGON • CALIFORNIA • IDAHO • UTAH • ARIZONA • MONTANA <br />WYOMING • COLORADO • NEW ME%ICO • NEBRASKA • NEVADA <br />