Laserfiche WebLink
MITIGATION OF ADVfiRSE [MPACTS BY SEPA <br />�• My grading/fill on this site shall be done so as to not impact the surrounding <br />Properties. (SEPA Earth, Land and Shoreline Use Policies.) <br />Z• Prior to issuance of any permits, the applicant musc pay a mitigadon fee of 59,040 per <br />the Interim Traffic MiiigaUon Ordinance No. 16'IO-89, as amended. (SEPA <br />Transportadon Policies) <br />3• The applicant sha(I provide a coatribudon of 520,000 for signa! equiprnent per <br />(SEPATConcomitant Rezone Agreement, Ordinance No. 1600-84 (see attachment). <br />ranspo�tation Policies) <br />4• The appiicant must provide a bus shelter on Beverly Boulevard and bus stop on <br />Broadway. (SEPA Transportadon pa�icies) <br />5• On-site deteotion will be required per Crty standy��. (SEPA Public Services and <br />Utilities Policies) <br />6. If greatec than 10,000 s.f. of paved svrface will be created by this project, water <br />qaality enhancement of s�tormwater runoff from the pave� areas mus� acur prior to <br />discharge of this scormwacer from the site. 'I'hree options for stormwater quality <br />enhancement ate presented in the cwrent City scanciards, 'I'be (easc preferred opdon <br />will onty be aliowed ig the firsc c�,o �pbo� aze not feasible in the opinion of the Public <br />warks Department. The options for stormwater quality enbancement aze identified in <br />ordet of preference: <br />t) M infiltration basin designed and consnucted according to City standaNs. <br />2) A wetpond designed and conshucted ro City standards. <br />3) A baffle-type oil/water separator followed by a vegetated swale, both de.signed <br />and coaswcced accordir.g to Ciry standards, (SEPA Water and Public Services <br />and Udlides Poticies) <br />�• C�ty standards call for all surface water e�titing the site to be conveyed to the nearest <br />e.ctablis6ed, stable drainage course by pipe or anapproved swale m a manner that wiil <br />not resuit in erosion or flooding. Stormwater nm�ff from this site cwrently discharges <br />onto Broadway where a defined drainage System does not ezist for most of the distance <br />from this site to the point w6ere flow encers a napual drainage course. To mcet City <br />standards, the applicant ap�ears to have two options for discharge of collecced <br />stormwater runoff from tlus site, 1) to install storm drains where they do not currendy <br />exisc fl'om this site down Broadway to the point where the flow enters a natural <br />drainage course, or 2) ro route the stormWater runoff across Broadway to the <br />Depa�ent of Tcancpor�ation's i-5 scorm drainage syskm. Whichever stamwaoer <br />must begpro�ded to en�abk the Ci� ty t�o'd5ete�im�ine� that th�e provid�ed�yt�em will convey� <br />tLe requ'ued flows without erosion or flooding, <br />Discharge of stormwater to the I-5 storm drainage yystem would require an easemeot <br />6'om the Uepartmenc of Transportadon, In addiaon, the condidoa of the I-5 storm <br />drain outlet to Wood Creek would need to be checked. Addidonal energy dissipation <br />would be required at the outlet if erosion was occurring or would occur as a result of <br />